Four kinds of steel home
Which kit fits the house
Open a home type to see how its frame is put together and what to read next.
Photo
Barndominium
A clear-span rigid frame with the living space and a shop or garage under one roof. A mezzanine can add a loft or a second floor.
Workshop buildings with office →Steel-frame house
A beam-and-column frame of one to three floors, with metal deck floors, for open plans and large windows.
Multi-storey steel framing →Backyard unit (ADU)
A small frame that goes up on a tight lot with a small crane, delivered in light bundles.
Steel mezzanine frames →Raised coastal home
A frame raised above flood level on a steel substructure, with connections and coating chosen for wind and salt air.
Hot-dip galvanizing →Steel instead of lumber
Why builders frame houses in steel
No rot, no termites
Steel does not rot, warp, shrink or feed termites, so the frame stays straight for the life of the house.
Designed for the site
Each kit is designed for the site wind, snow and seismic loads the design team sets, which matters on the coast and in the mountains.
One plan, many houses
A plan drawn once can be repeated across a subdivision, with only the site loads checked house by house.
From our project files
Phuket House, Thailand, 2020
A multi-level steel frame for the Phuket House project: members coated black in our plant, bundled for shipping and bolted together on site. We do not have a US house reference yet.
Photo
Photo
Photo
Photo
Scope, in writing
What we supply and what stays with your team
World Steel, our plant in Vietnam
- Frame, floor beams, metal deck, roof and wall framing designed to the contract documents
- Every member cut, drilled, coated and marked by gridline, with bolts and anchor bolts in the kit
- Shop and erection drawings at no extra cost, ready for your Engineer of Record
- Fabrication in our IAS AC472-accredited plant in Vietnam, packed house by house and tracked live in PEB Studio
The US contractor, our customer
- Drawing approval, the PE seal and the permit with your Engineer of Record
- Foundations, slab and utilities
- Erection of the kit, envelope, windows and roofing
- Plumbing, electrical, insulation, interiors and finishes
Questions from US contractors
Prefabricated steel home: questions and answers
6 answers, grouped by topic.
Home kits 3 answers
What comes in a steel home kit?
The structural frame: columns, beams, floor beams and deck, roof and wall framing, connection plates, bolts and anchor bolts, with erection drawings. Envelope, windows and interiors are by the builder.
Can a small crew put the frame up?
Yes. Members are marked by gridline and bolted together, and bundles are sized for the crane or lift the builder names. No welding is needed on site.
Have you framed a house before?
Yes. We fabricated the steel frame for the Phuket House project in Thailand in 2020; photos are on this page. We do not have a US house reference yet.
Builders and subdivisions 3 answers
Can you supply a subdivision of the same plan?
Yes. The plant fabricates 2,500 t of structural steel a month, so a subdivision can be fabricated in batches and packed house by house.
Who designs the house?
Your architect lays out the house. We design the steel frame for the site loads and prepare shop and erection drawings; your Engineer of Record approves and seals them.
Are steel-frame homes allowed under US codes?
Yes. Steel framing is covered by the IBC and the residential code your jurisdiction adopts. The design team confirms the path for each permit.
Keep reading
Related pages
Price it or partner with us
Send the house plans.
Share the plans, the site and how many houses. We will design and price the steel kit house by house.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Tell us about the building
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.
Or call +84 902 881 833