Your matched steel package
Residential & Modular Construction
Treat these as a first pass pulled from our reviewed engineering content. Your Engineer of Record confirms the structural design, and your local building department decides on code compliance and the permit.
Framing approaches to consider
- Cold-formed steel framing
- Structural steel frames
- Modular steel components
- Prefabricated framing kits
Points your engineer will check
Standard bay sizes and repeated connections reduce fabrication and field labor.
From: Residential & Modular Construction
Cold-formed framing inside the wall is protected to suit the climate zone and the wall assembly.
From: Residential & Modular Construction
Fire separation, acoustics and IRC or IBC residential provisions are confirmed by the project architect.
From: Residential & Modular Construction
Components to include
Systems in scope
Services that apply
Guides to read next
Comparable buildings
What happens next
- Share drawings, a sketch or simply the footprint and ZIP code.
- We agree the design loads with your Engineer of Record and draft a package scope.
- You get a written proposal listing what is in, what is out and the Incoterm.
Adjust your answers
Bidding a large US project?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.