Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Workforce housing

Workforce housing: one block, repeated

Workforce housing is a block of rooms repeated across a camp: two storeys, an outside walkway and stair, and the mess hall, laundry and office that serve them. Camps go up near plants, farms, mines and big job sites, often far from a steel supplier. Our plant fabricates 2,500 t of structural steel a month, so a whole camp can run as one order and ship block by block.

Size the camp

The same block, as many times as the job needs

Pick a camp size to see how the plan grows. Only the number of blocks changes; the block design stays the same.

MESS HALL ROOM BLOCKS · TWO STOREYS

Crew camp

A pair of room blocks with a small mess and laundry beside a job site or a plant shutdown.

Project camp

Rows of room blocks around a mess hall, with a camp office and parking, for a construction project of several years.

Long-term village

Room blocks in streets with a dining hall, gym and stores, for a plant, farm or mine that needs housing for decades.

Around the rooms

The buildings of a camp

Walkways and stairs

Outside walkways, stairs and canopies that link the blocks and keep people out of the rain.

External stairs →

Reference

FPI Barracks, Guam: about 120 t

A two-storey steel barracks building on Guam with a seismic-designed frame. We supplied the whole building package: structural design and calculations, permit and shop drawings, the frame, floor decking, anchor bolts, roof and wall panels, insulation and trims, delivered CIF to Guam.

See the project

From our project files

Our own office in Tay Ninh is a multi-storey steel frame with repeated bays, the same way of building a room block uses.

Crane beside the red multi-storey steel frame of the World Steel office in Tay Ninh Photo
Red steel beams and columns of the World Steel office frame in Tay Ninh against the sky Photo
Corner of the red multi-storey steel frame of the World Steel office in Tay Ninh Photo
Finished World Steel office building in Tay Ninh with red cladding and a glazed front Photo

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Room block frames, floors, walkways, stairs, mess halls and camp buildings designed to the contract documents
  • One block designed once and repeated, with only the site loads checked camp by camp
  • Shop and erection drawings at no extra cost, ready for your Engineer of Record
  • Fabrication in our IAS AC472-accredited plant in Vietnam, packed block by block and tracked live in PEB Studio

The US contractor, our customer

  • Drawing approval, the PE seal and the permit with your Engineer of Record
  • Site works, foundations, utilities and wastewater
  • Erection, envelope, doors and windows
  • Plumbing, electrical, HVAC, kitchens and furnishing

Questions from US contractors

Workforce housing steel: questions and answers

6 answers, grouped by topic.

Camp buildings 3 answers

Which camp buildings can be steel framed?

Room blocks, mess halls, kitchens, laundries, stores, offices, gyms and the walkways and canopies between them.

How many storeys can a room block have?

Most camps use two. The frame is designed for the storeys, floors and loads the design team sets, and the same block repeats across the camp.

Can the camp grow later?

Yes. A block designed once can be ordered again, so a camp can add rows of rooms as the workforce grows.

References and programs 3 answers

Have you supplied housing buildings before?

Yes. We supplied the FPI Barracks on Guam, a two-storey steel building of about 120 t, as a complete package from structural design and permit drawings to delivery. We have no US mainland camp reference yet.

Can you supply the panels and deck too?

Yes. For the FPI Barracks we supplied the frame, floor decking, anchor bolts, roof and wall panels, insulation and trims. The package is set per project.

Can a large camp ship together?

Yes. The plant fabricates 2,500 t of structural steel a month, so a camp of many blocks can be fabricated as one order and shipped block by block.

Keep reading

Related pages

Price it or partner with us

Send the camp layout and the block plan.

Share the room block, the camp buildings and the site. We will price one block and the whole camp.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Tell us about the building

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.

Or call +84 902 881 833

Or leave your project details