Large-project capacity
Frames for a year of factory output, from one plant
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
Inside one module
The four parts we fabricate
Pick a part to find it in the module frame.
Corner posts
Hollow or built-up posts with the stacking and lifting details at each end, cut and drilled to the module drawings.
Built-up steel columns →Floor frames
Perimeter beams and joists for the floor cassette, built square on a jig so the factory line can fit them out.
Steel mezzanine frames →Ceiling frames
A lighter frame tying the corner posts at the top, with openings for services where the design has them.
Connection plates →Podium and cores
A conventional steel podium, stair and elevator cores and corridor frames that the modules sit on and tie to.
Multi-storey steel framing →Built to stack
How repeat frames stay true
Jigs for repeat frames
Repeat frames are built on jigs, and the first of each type is measured against the drawing before the run continues.
Stacking and lifting details
Corner castings, stacking plates and lifting lugs are detailed with the modular engineer, so the load path runs post to post.
Packed for the factory line
Frames are packed in the order the factory builds them and marked by module type, so the line never waits for a missing part.
From our plant
Checked, measured and packed by type
We have no US modular factory reference yet. These are frames and members from our plant: fit-up checks, measuring before release, and packing by type for the next line.
Photo
Photo
Photo
Photo
Scope, in writing
What we supply and what stays with your team
World Steel, our plant in Vietnam
- Module corner posts, floor and ceiling frames, podium, cores and corridor steel designed to the contract documents
- Jig-built repeat frames, with the first of each type measured before the run continues
- Shop drawings at no extra cost, ready for the modular engineer and your Engineer of Record
- Fabrication in our IAS AC472-accredited plant in Vietnam, packed by module type and tracked live in PEB Studio
The US contractor, our customer
- Drawing approval, the PE seal, the state modular approval and the permit with your Engineer of Record
- Module assembly, walls, services and fit-out in the modular factory
- Foundations, transport of finished modules and setting them on site
- Envelope, connections between modules and site finishing
Questions from US contractors
Modular unit steel: questions and answers
6 answers, grouped by topic.
Module frames 3 answers
Do you build finished modules?
No. We fabricate the steel frames, podium and cores. The modular factory assembles the modules, fits them out and the US contractor sets them on site.
How accurate are repeat frames?
Repeat frames are built on jigs and the first of each type is measured against the drawing before the run continues. The tolerance is the one the modular engineer sets on the drawings.
Can frames ship flat to save container space?
Yes, where the design allows it. Floor and ceiling frames can ship as flat cassettes with bolted corner posts, and the factory joins them on its line.
Modular programs 3 answers
Have you supplied modular frames before?
Not for a US modular factory yet. Our references are multi-storey frames, platforms and box frames from our plant, and the World Steel office in Tay Ninh, a six-storey steel frame.
Who handles the state modular approval?
The modular company and its engineer, with the third-party agency the state names. We supply drawings and material records they need.
Can you keep up with a factory line?
The plant fabricates 2,500 t of structural steel a month, so frames for a whole project or a year of production can be scheduled in batches that match the line.
Keep reading
Related pages
Price it or partner with us
Send the module drawings and the run.
Share the module types, the frame drawings and how many of each. We will price the frames, podium and cores as one order.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024