Why it matters
A complete crate saves a day on site
Listed on the drawings
If the drawing shows it, the crate has it.
Counted twice
Checked at packing against the list.
Labeled by area
Crews open the crate they need.
Ships with the steel
Same containers as the frame.
How it is packed
From drawing to crate
- DetailedEvery small part on the shop drawings.
- Made in the shopCut, punched and coated.
- Checked and cratedCounted against the packing list.
Specification
Framing accessories at a glance
- Items
- Base angles, angle clips, spacers, closure angles and similar parts
- Material
- Cold-formed or hot-rolled steel as detailed
- Finish
- Primed or galvanized to match the framing
- Listing
- Every part on the drawings and the packing list
- Packing
- Boxed and crated by area, labeled to the erection drawings
- Spares
- Spare loose parts on request
Photo
PhotoWhere it goes
Buildings with lots of small parts
Questions
Framing accessory questions
What happens if a part is missing on site?
Every part is on the drawings and the packing list, and crates are checked at packing. If something is short, tell us with the mark number and we arrange a replacement.
Are base angles included?
Yes, where the wall detail uses them, they are listed and packed with the wall framing.
Can I get a packing list before shipment?
Yes. The packing list goes with the shipping documents so your team can plan unloading.
More secondary framing: Z Purlins · C Purlins · Wall Girts · Eave Struts · Sag Rods · Roof Bracing · Wall Bracing · Secondary Connection Components
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Framing Accessories
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions
Covered in our state guides