Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Secondary framing · Connection components

The small parts that hold the big parts together

Every purlin and girt connects to a frame through a clip, and every frame is steadied by flange braces. These are the smallest pieces in a steel building and among the most numerous. We fabricate them with the frame, weld clips on in the shop where it helps, and count every loose part into the package.

  • Purlin clipsSeat purlins on the rafters.
  • Girt clipsFix girts to the columns.
  • Flange bracesSteady the inside flange of frames.
  • Bolts and washersCounted by connection.
  • Spacers and shimsLine up members on site.
  • Strap and angle clipsSmall ties where the drawings call for them.

Why it matters

Small parts, no small problems on site

  • Welded on in the shop

    Fewer loose clips to handle and lose on site.

  • Counted to the drawings

    Every loose part listed and boxed.

  • Holes that line up

    Punched to the same drawings as the purlins.

  • Finished to match

    Same primer or galvanizing as the frame.

How it is supplied

Detailed, made and counted

  1. Connections detailedEvery clip on the shop drawings.
  2. Cut, punched, weldedShop-welded where it saves site work.
  3. Boxed and labeledBy area, with bolts counted in.

Specification

Connection components at a glance

ItemsPurlin and girt clips, flange braces, angle clips, straps and spacers
FabricationCut, punched and, where it helps, shop-welded to the frame
FinishPrimed or galvanized to match the framing
BoltsSupplied with the bolts, nuts and washers for each connection
MarkingLoose parts marked and boxed to the erection drawings
Design basisConnections to AISC 360 and AISI S100 as applicable
Coated frame parts with welded brackets in the paint hallPhoto
Primed column with its bolted end plate set on painting standsPhoto
Painted beams with bolted end plates resting on stands below an overhead cranePhoto

Where it goes

Every frame, every bay

Questions

Connection component questions

Are clips welded to the frames?

Where it saves site work and suits shipping, yes. Others ship loose and bolt on, marked to the erection drawings.

What are flange braces for?

They tie the inside flange of a frame to a purlin or girt so the frame cannot buckle sideways under load.

Will the bolts be included?

Yes. Bolts, nuts and washers are counted per connection and packed with the parts.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Secondary Connection Components

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Drawn illustration of secondary framing, standing in for a photo of this product Illustration

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.