Why it matters
Storm water handled before it finds the wall
No overflow into walls
Gutters sized for the water the roof collects.
Matched to the roof
Same coil and color as the panels and trims.
Fixed to the frame
Brackets detailed to the eave strut.
Shipped with the roof
Gutters, outlets and fittings in one package.
How it is sized
From your drainage design to folded gutters
- Drainage designRoof areas and rainfall from your designer.
- Gutter layoutGutters, outlets and slopes on the drawings.
- Folded from coilGutters and fittings folded to the details.
Specification
Roof drainage at a glance
| Items | Eave gutters, valley gutters, outlets, end caps, strainers and brackets |
|---|---|
| Material | Coated and painted steel to match the roof |
| Sizing | Gutter size and outlet count from your drainage design |
| Overflow | Overflow outlets or scuppers where the design calls for them |
| Fixing | Brackets to the eave strut at set spacing |
| Design basis | Plumbing code rainfall rates for your location, checked by your designer |
Photo
PhotoQuestions
Roof drainage questions
How big do the gutters need to be?
That follows your drainage design: roof area, slope and the rainfall rate in the plumbing code for your location. We fold gutters to that size.
Do you supply downspouts too?
Yes. Downspouts are listed with the drainage package; see our downspouts page.
What about overflow?
Where your designer calls for it, we add overflow outlets or scuppers so a blocked outlet cannot flood the roof.
More roofing: Metal Roof Panels · Standing Seam Roofing · Through-Fastened Roofing · Insulated Roof Panels · Roof Insulation · Ridge Caps · Roof Flashings · Roof Ventilators
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Roof Drainage Accessories
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions