Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Antigua and Barbuda · Coatings

Coatings for steel in Antigua and Barbuda’s salt air

No point in Antigua is far from the sea, and Barbuda is so low and flat that salt reaches everywhere. The trade winds blow steadily off the Atlantic, resorts sit on the beach and marinas fill English and Falmouth Harbours. Heat and humidity speed up corrosion. For Antigua and Barbuda we choose preparation, coating system and thickness for each exposure and record them member by member.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to St John’s.

Coated members drying in rows on stands in the paint hall
Members drying in the World Steel paint hall in Vietnam after coating.
Atlantic side
Direct spray
Resorts
Beachfront exposure
Brands
Jotun, PPG, Hempel and more
Option
Hot-dip galvanizing

Exposure

Matching the system to the site

Typical choices for Antigua and Barbuda, confirmed with your engineer for each project.

SiteTypical protection
Inland Antigua, enclosed buildingZinc-rich primer and finish coat on sheltered steel
St John’s and coastal townsZinc-rich primer, epoxy intermediate, polyurethane finish
Beachfront resortsMarine-grade high-build system or duplex
Barbuda and the Atlantic coastHot-dip galvanizing or duplex systems
Marinas and boatyardsGalvanized and painted, with access for upkeep

In our plant

How coating quality is built in

Blast cleaning

Members for Antigua and Barbuda are blast cleaned to the specified grade before priming.

Trained painters

Our painters are trained and certified by the paint manufacturer for the systems they apply to steel bound for Antigua and Barbuda.

Measured film

Dry film thickness measured and recorded for every member shipped to Antigua and Barbuda.

Brands sold locally

Jotun, PPG, Hempel, International Paint and others are sold across the Caribbean, so crews in Antigua and Barbuda can buy them for touch-up.

Antigua and Barbuda

After erection

Every bundle shipped to St John’s carries a touch-up note naming the paint system, so your crew repairs handling damage with the same product.

Products and solutions

The World Steel pages behind this guide

Parish by parish

How this applies in your parish

Antigua and Barbuda has 7 parishes. Open St Peter, St Mary or St Paul to see the local wind, ground and coast, the road from St John’s and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Antigua and Barbuda project is cut, welded, inspected and packed.

Roller conveyor carrying members into a shot-blasting machine
Surface preparation: the automatic shot blaster at the Vietnam plant.
Primed column with its bolted end plate set on painting stands
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Galvanized steel frames with punched bolt plates at the corners on shop trestles
Galvanized frames with their bolt holes open and clean after dipping, Vietnam.
Members in gray finish paint laid out in the paint hall
Gray finish coat applied in the Vietnam paint hall.

Q&A

What Antiguan and Barbudan buyers ask

Does all steel need marine coatings in Antigua and Barbuda?

Most sites are coastal in practice. Your engineer and the owner set the system; enclosed steel needs less than steel exposed to the weather.

Should Barbuda steel be galvanized?

Exposed steel on Barbuda often is, or gets a duplex system, because salt reaches the whole island.

Can we buy matching touch-up paint?

Yes. The brands we use are sold across the Caribbean, and each shipment to St John’s names the products.

Contact World Steel · Antigua and Barbuda

Talk to us about steel for Antigua and Barbuda

WhatsApp, email or a video call with our engineers, booked at an hour that suits St John’s. Our contact page for Antigua and Barbuda has the ports, the local time and the form.