Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

St Peter · Parish

Steel buildings and structural steel for St Peter, Antigua and Barbuda

St Peter runs from Parham, Antigua’s oldest town on its sheltered harbour, out to the north-east islands and the resorts on Long Island, with farms and villages inland.

North and the capital · Parish · Main town Parham

Main town
Parham
Group
North and the capital
Main towns
Parham, Pares, Vernons
Port
St John’s

Site conditions in St Peter

What the site asks of your steel

Wind
Atlantic exposure
Air
Salt from the north-east
Seismic
Lesser Antilles arc
Site
Island sites by boat

Our design note. St Peter’s steel goes into resort buildings on the islands, farm stores and village halls on the mainland. Galvanized steel and bundles sized for small boats fit the island sites.

St Peter at a glance

The ground, the work and the road in

Ground and climate

Flat limestone in the north-east, with mangrove shores and small offshore islands.

What gets built

Resorts, fishing, agriculture, housing and small community services.

Getting steel there

Twenty-five to thirty-five minutes from St John’s harbour by road; offshore islands by boat.

Towns: Parham · Pares · Vernons · Long Island · Seatons

Steel we recommend

What we fabricate for St Peter

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Resorts and hotels

Multi-storey hotel frames, villas, long-span lobbies and restaurant roofs for tourism.

Multi-story steel buildings →

Agricultural buildings

Farm stores, packing houses, livestock sheds and agro-processing buildings.

Agricultural steel buildings →

Schools, halls and shelters

Classrooms, community halls and sports buildings that double as hurricane shelters.

Sports facilities and arenas →

Contractors in St Peter

You win the job in St Peter. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in St Peter

Can steel reach the offshore resort islands?

Yes. We size bundles and members for small boats and barges, with bolted splices where needed.

Can you supply farm buildings?

Yes. Stores, packing sheds and livestock buildings, shipped as complete steel kits.

North and the capital

Other parishes: north and the capital

St John’s and its harbour, the airport parish of St George and St Peter with Parham and the north-east islands.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Antigua and Barbuda. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Antigua and Barbuda

Talk to us about steel for St Peter

Send the drawings or the site, size and use. We design or detail the steel for St Peter’s hurricane, seismic and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to St John’s. WhatsApp, email or a video call with our engineers, booked at an hour that suits St John’s. Our contact page for Antigua and Barbuda has the ports, the local time and the form.