Antigua and Barbuda · Earthquakes and ground

Earthquake loads and island ground for steel in Antigua and Barbuda

Antigua is built of three kinds of ground. The north-east is flat limestone, the middle is a clay plain, and the south-west rises into old volcanic hills topped by Mount Obama, once Boggy Peak, at 402 m. Barbuda is low coral limestone around a great lagoon. Under all of it runs the Lesser Antilles subduction zone: the 1843 earthquake brought down much of St John’s. Light, ductile steel frames suit this ground and this risk.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to St John’s.

Welder looking over the stiffeners and end plate of a heavy column
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Seismic
Lesser Antilles arc
North-east
Limestone
South-west
Volcanic hills, 402 m
Steel design
AISC 341 where required

Ground types

What lies under the site

Your geotechnical engineer confirms the ground for each site.

AreaTypical groundWhat it means for steel
North-east Antigua, St Peter and St GeorgeLimestone, generally firmLight frames on shallow foundations in most cases
Central plainClays that swell and shrinkFoundations designed for movement by your engineer
South-west hills, St Mary and St PaulVolcanic rock and slopesCut and fill, stepped foundations, wind speed-up
BarbudaLow coral limestone and sandStorm surge levels and light frames
St John’s waterfrontFill near the harbourPiled or raft foundations by your engineer

Seismic frames

How we detail for earthquakes

Moment frames

Portal and multi-bay frames for warehouses, halls and resorts.

Braced frames

Efficient bracing for multi-storey hotels, offices and clinics.

AWS D1.8 welding

Qualified procedures and welders for demand-critical welds.

Base plates and anchors

Base plates sized for uplift and seismic shear together.

Who does what

Ground and seismic work, split clearly

World Steel supplies

  • Frames detailed to AISC 341 where the design calls for it
  • Column reactions for the foundation design
  • Base plates, anchor bolt plans and templates
  • Plate with EN 10204 3.1 certificates on request
  • Remote or in-person inspector access

In Antigua and Barbuda, the contractor and the engineer of record arrange

  • Geotechnical investigation
  • Site class and seismic design category
  • Foundation design and construction
  • Special inspections on site
  • Erection to the drawings

Products and solutions

The World Steel pages behind this guide

Parish by parish

How this applies in your parish

Antigua and Barbuda has 7 parishes. Open Barbuda, St John or St George to see the local wind, ground and coast, the road from St John’s and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Antigua and Barbuda project is cut, welded, inspected and packed.

Fitter comparing a built-up beam with its shop drawing
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.
Tubular column with a square base plate and bolt holes, crew working behind it
Column with its base plate and anchor-bolt holes, fabricated in the Vietnam plant.
Operator checking web and flange plates set in blue H-beam assembly jigs
Web and flange plates set in the H-beam assembly jigs before automatic welding, Vietnam plant.
Welder guiding a drilled base plate hanging from a jib hoist
A drilled base plate on its way to fit-up in the Vietnam plant.

Q&A

What Antiguan and Barbudan buyers ask

How strong are earthquakes in Antigua?

Strong events are rare but real: the 1843 earthquake was destructive and the 1974 earthquake damaged buildings across the island. Your engineer sets the design values from the code and the soil report.

Does the central plain clay affect steel buildings?

It affects the foundations. Clays can swell and shrink; your geotechnical engineer sets the foundation, and a light steel frame keeps the loads low.

Is Barbuda’s ground different from Antigua’s?

Yes. Barbuda is low, flat coral limestone and sand, so storm surge and wind govern more than slopes do.

Official sources: UWI Seismic Research Centre