Why it matters
One design basis for two hazards
Antigua and Barbuda must design for both hurricane wind and earthquake shaking, and the governing case can change from one building to the next. A light single-storey warehouse is usually governed by wind; a heavy multi-storey block may be governed by seismic load. Stating both clearly on the first sheet lets every reviewer check the same numbers.
Resort groups and international owners often add their own specifications, usually based on US practice. We design to the basis your engineer of record agrees with the owner and the authorities, and keep it on every sheet.
Design basis
What the steel design states
The items we confirm with your engineer of record in Antigua and Barbuda before modeling.
| Item | What we state |
|---|---|
| Code | The Antigua and Barbuda Building Code and the editions it references |
| Wind | Basic wind speed, exposure and risk category for the site |
| Seismic | Site class, spectral values and seismic design category |
| Steel | AISC 360 design, AISC 341 where seismic detailing applies |
| Owner specs | Resort brand or owner specifications where required |
Who does what
Approval work, split clearly
World Steel supplies
- Steel design or detailing to the Antigua and Barbuda Building Code
- Calculations and drawings for review
- Answers to plan-review comments on the steel in Antigua and Barbuda
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
In Antigua and Barbuda, the contractor and the engineer of record arrange
- Development Control Authority approval
- Barbuda Council consent on Barbuda
- Geotechnical report and site class
- Inspections on site
- Foundations and erection
Antigua and Barbuda
What we do not claim
World Steel holds no approval, licence or registration in Antigua and Barbuda and does not apply for permits. The engineer of record approves the design and your team files it with the authorities in Antigua and Barbuda.
Products and solutions
The World Steel pages behind this guide
Parish by parish
How this applies in your parish
Antigua and Barbuda has 7 parishes. Open St John, St George or St Peter to see the local wind, ground and coast, the road from St John’s and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Antigua and Barbuda project is cut, welded, inspected and packed.
Q&A
What Antiguan and Barbudan buyers ask
Who approves a steel building in Antigua?
The Development Control Authority grants development approval. Your team files the application with the engineer or architect of record.
Is Barbuda approved the same way?
Barbuda has its own council, which takes part in land and development decisions on the island. Your team confirms the route for each site.
Does the code use US standards?
It draws on international practice, and engineers commonly use US standards such as the IBC, ASCE 7 and AISC 360 for the detail. Your engineer of record sets the exact basis.
Official sources: National Office of Disaster Services
Antigua and Barbuda solutions
Every Antigua and Barbuda guide
Related pages
Code facts on this page summarize practice in Antigua and Barbuda and the standards it references. They are not legal or engineering advice; your engineer of record and the Development Control Authority confirm the code and edition in force for your project.
Contact World Steel · Antigua and Barbuda
Talk to us about steel for Antigua and Barbuda
WhatsApp, email or a video call with our engineers, booked at an hour that suits St John’s. Our contact page for Antigua and Barbuda has the ports, the local time and the form.