Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Wanica · District

Steel buildings and structural steel for Wanica, Suriname

Wanica is the fast-growing district between Paramaribo and the airport road, with Lelydorp as its centre, the oil refinery at Tout Lui Faut and spreading housing, malls and industry.

Greater Paramaribo · Capital Lelydorp

Capital
Lelydorp
Group
Greater Paramaribo
Main towns
Lelydorp, Domburg, Koewarasan
Port
Paramaribo

Site conditions in Wanica

What the site asks of your steel

Ground
Soft clay
Flood
Low ground in heavy rain
Air
Humid all year
Industry
Refinery area

Our design note. Wanica’s plants, warehouses and malls sit on soft clay close to the capital. Light, long-span steel frames keep piles and settlement down.

Wanica at a glance

The ground, the work and the road in

Ground and climate

Soft coastal clay with sand ridges, low and wet in the rainy seasons.

What gets built

Industry, the refinery, warehouses, retail, agriculture and new housing.

Getting steel there

Twenty to forty minutes from the Port of Paramaribo by road.

Towns: Lelydorp · Domburg · Koewarasan · Houttuin · Tout Lui Faut

Steel we recommend

What we fabricate for Wanica

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Process and manufacturing plants

Portal and crane-bay frames, platforms and pipe racks for plants and terminals.

Manufacturing plants and crane bays →

Warehouses and logistics

Clear-span warehouses, shore bases and distribution centers.

Warehouse and distribution buildings →

Commercial buildings

Supermarkets, malls, showrooms and office blocks.

Commercial steel buildings →

Contractors in Wanica

You win the job in Wanica. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Wanica

Can you supply plants near the refinery?

Yes. Plant buildings, workshops and pipe racks, coated to the owner’s specification.

Do Wanica sites need piles?

Often, on soft clay. Light steel frames reduce how many and how deep; your engineer decides.

Greater Paramaribo

Other districts: Greater Paramaribo

The capital, Wanica, Commewijne across the river and Para with the international airport.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Suriname. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Suriname

Talk to us about steel for Wanica

Send the drawings or the site, size and use. We design or detail the steel for Wanica’s soft-clay, rainfall and humidity conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Paramaribo. WhatsApp, email or a video call with our engineers, booked at an hour that suits Paramaribo. Our contact page for Suriname has the ports, the local time and the form.