Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Brokopondo · District

Steel buildings and structural steel for Brokopondo, Suriname

Brokopondo holds the vast reservoir behind the Afobaka Dam, which generates much of Suriname’s electricity, and large gold mining operations near Brownsweg.

East and interior · Capital Brokopondo

Capital
Brokopondo
Group
East and interior
Main towns
Brokopondo, Afobaka, Klaaskreek
Port
Paramaribo

Site conditions in Brokopondo

What the site asks of your steel

Rain
Very heavy
Air
Humid, wet forest
Ground
Shield rock, laterite
Access
Interior road

Our design note. Brokopondo needs mine process buildings, truck shops, power and plant buildings far from the coast. Galvanized steel, remote-site packing and clear erection drawings are essential.

Brokopondo at a glance

The ground, the work and the road in

Ground and climate

Weathered rock and laterite of the Guiana Shield, with forest and the reservoir shores.

What gets built

Gold mining, hydropower, forestry, tourism on the lake and village services.

Getting steel there

Two to three hours from the Port of Paramaribo by road.

Towns: Brokopondo · Afobaka · Klaaskreek · Brownsweg · Rosebel

Steel we recommend

What we fabricate for Brokopondo

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Mining structures

Process plant buildings, conveyor galleries and truck shops for gold mines.

Mining steel structures →

Oil, gas and energy

Pipe racks, process structures, workshops and shore-base buildings.

Energy and power utilities →

Warehouses and logistics

Clear-span warehouses, shore bases and distribution centers.

Warehouse and distribution buildings →

Contractors in Brokopondo

You win the job in Brokopondo. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Brokopondo

Can you supply gold mine buildings?

Yes. Process plant buildings, conveyor galleries, truck shops and warehouses, galvanized for wet forest sites.

How does steel reach Brokopondo?

By road from the Port of Paramaribo, with bundles sized for the interior route.

East and interior

Other districts: East and interior

Marowijne on the French Guiana border, Brokopondo with its lake and dam, and the rainforest of Sipaliwini.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Suriname. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Suriname

Talk to us about steel for Brokopondo

Send the drawings or the site, size and use. We design or detail the steel for Brokopondo’s soft-clay, rainfall and humidity conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Paramaribo. WhatsApp, email or a video call with our engineers, booked at an hour that suits Paramaribo. Our contact page for Suriname has the ports, the local time and the form.