Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Coronie · District

Steel buildings and structural steel for Coronie, Suriname

Coronie is the quiet coastal district between Saramacca and Nickerie, known for its coconut groves, honey and fishing, strung along the East-West Link road.

West coast · Capital Totness

Capital
Totness
Group
West coast
Main towns
Totness, Friendship, Burnside
Port
Paramaribo

Site conditions in Coronie

What the site asks of your steel

Ground
Soft clay
Air
Atlantic salt
Flood
Low coast
Site
Rural

Our design note. Coronie needs farm stores, cold rooms for fish, schools and clinics. Steel kits that a small crew can erect on soft ground suit the district.

Coronie at a glance

The ground, the work and the road in

Ground and climate

Soft clay and sand ridges between the coast and swamps.

What gets built

Agriculture, fishing, honey, small communities and public services.

Getting steel there

Two to three hours from the Port of Paramaribo along the East-West Link.

Towns: Totness · Friendship · Burnside · Welgelegen

Steel we recommend

What we fabricate for Coronie

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Agricultural buildings

Rice mills, silos supports, stores and agro-processing sheds.

Agricultural steel buildings →

Schools, halls and clinics

Classrooms, clinics, community halls and sports halls.

Sports facilities and arenas →

Cold storage

Cold rooms and chilled warehouses for fish, shrimp and food distribution.

Cold storage buildings →

Contractors in Coronie

You win the job in Coronie. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Coronie

Can you supply cold stores for fish?

Yes. Cold storage buildings and processing sheds, coated for coastal air.

Can small local crews erect your steel?

Yes. Pieces arrive marked and drilled, with clear erection drawings for small cranes.

West coast

Other districts: West coast

Nickerie, Coronie and Saramacca: rice polders, coastal swamp and the onshore oil fields.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Suriname. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Suriname

Talk to us about steel for Coronie

Send the drawings or the site, size and use. We design or detail the steel for Coronie’s soft-clay, rainfall and humidity conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Paramaribo. WhatsApp, email or a video call with our engineers, booked at an hour that suits Paramaribo. Our contact page for Suriname has the ports, the local time and the form.