Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Saramacca · District

Steel buildings and structural steel for Saramacca, Suriname

Saramacca, west of Paramaribo, holds the onshore oil fields around Tambaredjo and Calcutta, rice and vegetable farms along the Saramacca River and wide coastal swamps.

West coast · Capital Groningen

Capital
Groningen
Group
West coast
Main towns
Groningen, Tambaredjo, Calcutta
Port
Paramaribo

Site conditions in Saramacca

What the site asks of your steel

Ground
Soft clay and swamp
Flood
Low polders
Air
Humid, salt on the coast
Industry
Oil fields

Our design note. Saramacca needs workshops, stores and plant buildings for the oil fields and farm buildings for the polders. Light steel and galvanized exposed members suit swampy, humid ground.

Saramacca at a glance

The ground, the work and the road in

Ground and climate

Soft coastal clay, swamp and sand ridges along the coast and river.

What gets built

Onshore oil production, agriculture, fishing and public services.

Getting steel there

About forty minutes to an hour from the Port of Paramaribo along the East-West Link.

Towns: Groningen · Tambaredjo · Calcutta · Uitkijk · Wayamboweg

Steel we recommend

What we fabricate for Saramacca

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Oil, gas and energy

Pipe racks, process structures, workshops and shore-base buildings.

Energy and power utilities →

Agricultural buildings

Rice mills, silos supports, stores and agro-processing sheds.

Agricultural steel buildings →

Warehouses and logistics

Clear-span warehouses, shore bases and distribution centers.

Warehouse and distribution buildings →

Contractors in Saramacca

You win the job in Saramacca. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Saramacca

Can you supply oil field buildings?

Yes. Workshops, stores, pipe racks and plant buildings to the owner’s specification.

Can steel go on swampy ground?

With foundations designed by your engineer, yes; light frames reduce the load on the swamp.

West coast

Other districts: West coast

Nickerie, Coronie and Saramacca: rice polders, coastal swamp and the onshore oil fields.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Suriname. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Suriname

Talk to us about steel for Saramacca

Send the drawings or the site, size and use. We design or detail the steel for Saramacca’s soft-clay, rainfall and humidity conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Paramaribo. WhatsApp, email or a video call with our engineers, booked at an hour that suits Paramaribo. Our contact page for Suriname has the ports, the local time and the form.