Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Para · District

Steel buildings and structural steel for Para, Suriname

Para stretches south from the coast into the savanna belt, with Johan Adolf Pengel International Airport at Zanderij, the former alumina works at Paranam on the Suriname River and forest and savanna villages.

Greater Paramaribo · Capital Onverwacht

Capital
Onverwacht
Group
Greater Paramaribo
Main towns
Onverwacht, Zanderij, Paranam
Port
Paramaribo

Site conditions in Para

What the site asks of your steel

Ground
Savanna sand, clay north
Rain
Heavy in the wet seasons
Air
Humid
Site
Airport area

Our design note. Para’s airport, cargo and industrial sites sit on firmer savanna ground than the coast. Long-span hangars and warehouses suit it well.

Para at a glance

The ground, the work and the road in

Ground and climate

Firmer savanna sand and old weathered rock, with clay nearer the coast and wet creeks.

What gets built

The airport and air cargo, industry, forestry, agriculture and public services.

Getting steel there

Forty minutes to an hour from the Port of Paramaribo by road.

Towns: Onverwacht · Zanderij · Paranam · Bersaba · Hannover

Steel we recommend

What we fabricate for Para

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Hangars and terminals

Long-span frames for terminals, hangars and helicopter bases.

Aircraft hangar buildings →

Warehouses and logistics

Clear-span warehouses, shore bases and distribution centers.

Warehouse and distribution buildings →

Schools, halls and clinics

Classrooms, clinics, community halls and sports halls.

Sports facilities and arenas →

Contractors in Para

You win the job in Para. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Para

Can you supply airport and cargo buildings at Zanderij?

Yes. Hangars, cargo sheds and terminal frames with long spans.

Is the ground better than on the coast?

Often yes in the savanna belt; your geotechnical engineer confirms for each site.

Greater Paramaribo

Other districts: Greater Paramaribo

The capital, Wanica, Commewijne across the river and Para with the international airport.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Suriname. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Suriname

Talk to us about steel for Para

Send the drawings or the site, size and use. We design or detail the steel for Para’s soft-clay, rainfall and humidity conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Paramaribo. WhatsApp, email or a video call with our engineers, booked at an hour that suits Paramaribo. Our contact page for Suriname has the ports, the local time and the form.