A clear span
Long-span rafters or trusses keep the whole floor free of columns, so any layout fits.
Long-span steel structures →Large-project capacity
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
5,000 t
Sunpro Steel Factory
Can Tho City, Vietnam · 2024
2,500 t
CPV Food Processing Factory
Dong Nai Province, Vietnam · 2020
2,000 t
Long Son petrochemical
Ba Ria–Vung Tau, Vietnam · 2022
2,000 t
M&D warehouse, Thailand
Thailand · 2024
1,500 t
Tongwei feed factory, phase 1
Dong Thap Province, Vietnam · 2018
1,000 t
New Era cold storage, phase 1
Tay Ninh Province, Vietnam
One week, four layouts
Pick a day to see the hall set for it. The steel stays the same; only the floor changes.
Monday · Futsal and basketball
Courts marked on the floor, nets and backstops lowered from the roof, and no columns for players to run into.
Wednesday · Farmers market
Rows of stalls, wide doors open to the street and fresh air through roof vents and louvers.
Friday · Concert
A stage at one end, lights and speakers rigged from the roof steel, and rows of seats on the open floor.
Saturday · Wedding banquet
Round tables, a dance floor and a kitchen door on the side, with the same roof dressed in lights.
What makes the switch possible
Long-span rafters or trusses keep the whole floor free of columns, so any layout fits.
Long-span steel structures →Lights, speakers and nets hang from points designed into the roof, set with the stage and court layout.
Lighting support structures →Large doors in the end and side walls, framed so stages, stalls and equipment come straight in.
Industrial overhead doors →Acoustic and insulated panels keep a full hall comfortable and stop the echo.
Acoustic insulation →From our project files
A large hall in Kalgoorlie-Boulder, Western Australia, roofed with curved built-up rafters made in our plant in Vietnam and exported. We do not have a US multi-purpose hall reference yet.
Photo
Photo
Photo
Photo
Scope, in writing
World Steel, our plant in Vietnam
The US contractor, our customer
Questions from US contractors
6 answers, grouped by topic.
Yes, if the frame is planned for both from the start: a clear span, the height the sports need, rigging points for events and doors wide enough for stages.
Yes, at the points and loads set at design. The rigging steel is designed with the frame and drilled in the shop.
Yes. We make curved built-up rafters in our plant, as we did for the Goldfields Arts Centre hall.
The Goldfields Arts Centre in Kalgoorlie-Boulder, Western Australia, with about 400 t of steel, including curved built-up rafters made in our plant in Vietnam and exported.
Not yet. Our US community reference is the North West Community Center (2023).
The US contractor, our customer, and the owner's suppliers. We design and fabricate the steel and the building envelope.
Keep reading
Price it or partner with us
Share the floor, the stage, the rigging and the doors. We will design and price the hall frame and envelope together.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Tell us about the building
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.
Or call +84 902 881 833