Gymnasiums

Gymnasiums: nothing in the way of the game

A gym is a court with a roof that has to stay out of the way. No columns on the floor, enough height for a high ball, and a frame strong enough to carry the backstops, curtains and scoreboard that hang from it. Our plant fabricates 2,500 t of structural steel a month, so a US contractor can frame one gym or a whole school program from one plant.

ROOF TRUSS LINES

What hangs from the roof

The frame carries more than the roof

Switch on what your gym needs. Each one adds a load the steel is designed for.

HOME 52 · 48 GUEST CLEAR HEIGHT NO COLUMNS ON THE COURT

Switch an item on to see what the steel does for it.

Backstops

Ceiling-hung or wall-folding backstops need fixed points and bracing in the roof. Their positions are set with the court layout so the steel is ready for them.

Steel trusses →

Divider curtain

A curtain that splits the gym into two courts runs on a track hung from the frame, so the members along its line are sized for it.

Built-up steel rafters →

Scoreboard

Scoreboards and speakers hang from or fix to the end walls and roof, with the support steel designed and drilled in the shop.

Lighting support structures →

Ducts and lights

Ducts, lights and fans run between the roof members, kept above the ball line the owner sets for the sports played.

Roof ventilators →

Roof and walls

Height, light and a quieter gym

Height for the game

Clear height under the roof is set by the sports played and the owner's standard, and the frame is designed to it from the start.

Daylight without glare

Skylights and high windows are placed so light falls on the court without blinding players at the hoops.

Quieter inside

Insulated and acoustic panels on roof and walls cut the echo of a full gym and keep the heat out.

US reference

North West Community Center, United States, 2023

A steel-framed community building we designed and fabricated for a US project. The first two images are our 3D design models, not photographs; the others show frames and columns in our plant.

See the project
3D design model of the North West Community Center steel frame going up, with a scissor lift 3D model
3D design model of the North West Community Center steel frame from the corner of the site 3D model
Red-primed steel frame assemblies on the shop floor of the World Steel plant Photo
Primed steel columns with welded connection plates in the World Steel plant Photo

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Gym frame, roof trusses or rafters, support steel for backstops, curtains and scoreboards, and entry canopies designed to the contract documents
  • Roof and wall panels, insulation, skylights and trims when the package includes them
  • Shop and erection drawings at no extra cost, ready for your Engineer of Record
  • Fabrication in our IAS AC472-accredited plant in Vietnam, tracked live in PEB Studio

The US contractor, our customer

  • Drawing approval, the PE seal and the permit with your Engineer of Record
  • Gym equipment, sports floor, seating and the equipment loads
  • Foundations, slab and site work
  • Erection, envelope and fit-out

Questions from US contractors

Gymnasium steel: questions and answers

6 answers, grouped by topic.

Courts and roof 3 answers

How wide can a gym be without columns?

The span is designed around the courts and run-off space the owner needs. Two or three courts side by side are usually framed with long-span rafters or trusses and no columns on the floor.

Can the roof carry backstops and a divider curtain?

Yes, when their positions and weights are known at design. The support steel is designed with the frame and drilled in the shop, so nothing has to be cut in on site.

How high should the roof be?

The clear height comes from the sports played and the owner's standard. The design team sets it with you before the frame is designed.

Schools and references 3 answers

Can you supply a gym as part of a school building?

Yes. The gym frame can be part of a larger school or community building package, shipped together in erection sequence.

Have you framed a community building in the US?

Yes. We designed and fabricated the steel for the North West Community Center in the United States, completed in 2023. The images on this page are our 3D design models, not photographs.

Who installs the gym equipment?

The US contractor, our customer, and the equipment supplier. We design and fabricate the steel it hangs from.

Keep reading

Related pages

Price it or partner with us

Send the court layout and the equipment list.

Share the courts, the seating and what hangs from the roof. We will design and price the gym frame around them.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Tell us about the building

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.

Or call +84 902 881 833

Or leave your project details