Large-project capacity
One gym or a school program, from one plant
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
- 5,000 t Sunpro Steel Factory Steel industry · about 5,500 short tons
- 2,500 t CPV Food Processing Factory Food processing · about 2,750 short tons
- 2,000 t Long Son petrochemical Oil and gas · about 2,200 short tons
- 2,000 t M&D warehouse, Thailand Warehouse and industrial · about 2,200 short tons
- 1,500 t Tongwei feed factory, phase 1 Animal feed · about 1,650 short tons
- 1,000 t New Era cold storage, phase 1 Cold storage, phase 1 tonnage · about 1,100 short tons
What hangs from the roof
The frame carries more than the roof
Switch on what your gym needs. Each one adds a load the steel is designed for.
Switch an item on to see what the steel does for it.
Backstops
Ceiling-hung or wall-folding backstops need fixed points and bracing in the roof. Their positions are set with the court layout so the steel is ready for them.
Steel trusses →Divider curtain
A curtain that splits the gym into two courts runs on a track hung from the frame, so the members along its line are sized for it.
Built-up steel rafters →Scoreboard
Scoreboards and speakers hang from or fix to the end walls and roof, with the support steel designed and drilled in the shop.
Lighting support structures →Ducts and lights
Ducts, lights and fans run between the roof members, kept above the ball line the owner sets for the sports played.
Roof ventilators →Roof and walls
Height, light and a quieter gym
Height for the game
Clear height under the roof is set by the sports played and the owner's standard, and the frame is designed to it from the start.
Daylight without glare
Skylights and high windows are placed so light falls on the court without blinding players at the hoops.
Quieter inside
Insulated and acoustic panels on roof and walls cut the echo of a full gym and keep the heat out.
US reference
North West Community Center, United States, 2023
A steel-framed community building we designed and fabricated for a US project. The first two images are our 3D design models, not photographs; the others show frames and columns in our plant.
3D model
3D model
Photo
Photo
Scope, in writing
What we supply and what stays with your team
World Steel, our plant in Vietnam
- Gym frame, roof trusses or rafters, support steel for backstops, curtains and scoreboards, and entry canopies designed to the contract documents
- Roof and wall panels, insulation, skylights and trims when the package includes them
- Shop and erection drawings at no extra cost, ready for your Engineer of Record
- Fabrication in our IAS AC472-accredited plant in Vietnam, tracked live in PEB Studio
The US contractor, our customer
- Drawing approval, the PE seal and the permit with your Engineer of Record
- Gym equipment, sports floor, seating and the equipment loads
- Foundations, slab and site work
- Erection, envelope and fit-out
Questions from US contractors
Gymnasium steel: questions and answers
6 answers, grouped by topic.
Courts and roof 3 answers
How wide can a gym be without columns?
The span is designed around the courts and run-off space the owner needs. Two or three courts side by side are usually framed with long-span rafters or trusses and no columns on the floor.
Can the roof carry backstops and a divider curtain?
Yes, when their positions and weights are known at design. The support steel is designed with the frame and drilled in the shop, so nothing has to be cut in on site.
How high should the roof be?
The clear height comes from the sports played and the owner's standard. The design team sets it with you before the frame is designed.
Schools and references 3 answers
Can you supply a gym as part of a school building?
Yes. The gym frame can be part of a larger school or community building package, shipped together in erection sequence.
Have you framed a community building in the US?
Yes. We designed and fabricated the steel for the North West Community Center in the United States, completed in 2023. The images on this page are our 3D design models, not photographs.
Who installs the gym equipment?
The US contractor, our customer, and the equipment supplier. We design and fabricate the steel it hangs from.
Keep reading
Related pages
Price it or partner with us
Send the court layout and the equipment list.
Share the courts, the seating and what hangs from the roof. We will design and price the gym frame around them.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Tell us about the building
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.
Or call +84 902 881 833