Your matched steel package
Energy & Utilities
Treat these as a first pass pulled from our reviewed engineering content. Your Engineer of Record confirms the structural design, and your local building department decides on code compliance and the permit.
Framing approaches to consider
- Equipment support steel
- Pipe racks
- Access platforms and stairs
- Galvanized structures
Points your engineer will check
Wastewater interiors and open yards are corrosive, so galvanizing or coating is chosen for each exposure.
From: Energy & Utilities
Equipment loads, vibration and maintenance clearances are agreed with the plant designer.
From: Energy & Utilities
Facilities that must operate after a storm or earthquake may be Risk Category IV, as set by the Engineer of Record.
From: Energy & Utilities
Components to include
Coating and corrosion options
Systems in scope
Services that apply
Guides to read next
Comparable buildings
What happens next
- Share drawings, a sketch or simply the footprint and ZIP code.
- We agree the design loads with your Engineer of Record and draft a package scope.
- You get a written proposal listing what is in, what is out and the Incoterm.
Adjust your answers
Bidding a large US project?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.