Your matched steel package
Data Centers & Technology
Treat these as a first pass pulled from our reviewed engineering content. Your Engineer of Record confirms the structural design, and your local building department decides on code compliance and the permit.
Framing approaches to consider
- Structural steel frames
- Equipment platforms
- Repeatable modular framing
- MEP and cable support steel
Points your engineer will check
Equipment weights, busway and cable routes and cooling units are fixed early so supports are sized once.
From: Data Centers & Technology
Rooftop dunnage is designed for ASCE 7 wind and seismic forces on equipment as well as gravity.
From: Data Centers & Technology
Platform and support tolerances are held by shop drawings checked against the MEP model.
From: Data Centers & Technology
Components to include
Systems in scope
Services that apply
Guides to read next
What happens next
- Share drawings, a sketch or simply the footprint and ZIP code.
- We agree the design loads with your Engineer of Record and draft a package scope.
- You get a written proposal listing what is in, what is out and the Incoterm.