Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Edge, telecom and network hub buildings

Edge and telecom buildings: one design, fifty sites

An edge or telecom program is many small buildings rather than one big one: the same shell, the same racks and the same cooling, repeated across towns with different weather. The design repeats and the loads change. Our plant fabricates 2,500 t of structural steel a month, so a whole rollout can be fabricated in waves and shipped site by site.

Same building, different site. Pick a condition:

Girts, cladding fixings, bracing and anchor bolts are sized for the higher design wind speed, and doors for the pressure.

Purlins and rafters are sized for the ground snow load and drifts against rooftop units and parapets.

Bracing, connections and the anchorage of rooftop and rack equipment follow the seismic design category of the site.

Insulated roof and wall panels and framed openings for extra cooling units; members stay the same.

Large-project capacity

A whole rollout, fabricated in waves from one plant

World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.

2,500 metric tons a month

ProjectSectorWhereStructural steel
Sunpro Steel FactorySteel industryCan Tho City, Vietnam · 20245,000 t
CPV Food Processing FactoryFood processingDong Nai Province, Vietnam · 20202,500 t
Long Son petrochemicalOil and gasBa Ria–Vung Tau, Vietnam · 20222,000 t
M&D warehouse, ThailandWarehouse and industrialThailand · 20242,000 t
Tongwei feed factory, phase 1Animal feedDong Thap Province, Vietnam · 20181,500 t
New Era cold storage, phase 1Cold storage, phase 1 tonnageTay Ninh Province, Vietnam1,000 t

One container, one site

What ships to each site

The parts repeat from site to site. Only the member sizes that the local loads govern change, and the drawings say so.

Small clad steel building in a snowy landscape in Japan, framed by World Steel

Frame

Columns, rafters and bracing from the program’s standard drawings, with member sizes checked for the site.

Rigid frame systems →

Cable support

Ladder tray supports inside and a cable bridge to the generator or the meet-me vault outside.

Cable tray supports →

Packed for the site

Each building is bundled, marked and loaded on its own, so a crew opens one container and builds one site.

Final release and packing →

From our project files

Small buildings, snow loads and tight containers

We have framed small buildings erected in Japanese winters, and shipped two small warehouses for Thailand in a single container, bundled building by building. We have no data center or telecom reference yet; these show how a rollout of small buildings is fabricated and packed.

Data center steel
Small steel frame standing in snow in Japan Photo
Blue steel members for two small warehouses packed tightly in a shipping container Photo
Bundled blue frame members for the 12 m wide warehouses Photo
Workers loading bundled blue steel into a container at the World Steel plant Photo

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • A standard frame design for the program, checked and adjusted for each site’s wind, snow and seismic loads
  • Roof equipment dunnage, cable supports and canopy steel for each building
  • Shop and erection drawings at no extra cost, ready for your Engineer of Record
  • Fabrication in our IAS AC472-accredited plant in Vietnam, packed site by site and tracked live in PEB Studio

The US contractor, our customer

  • Site approvals, the PE seal and the permit with your Engineer of Record for each site
  • Racks, cooling, generators, power and fiber, and their suppliers
  • Foundations, security fencing and site work
  • Erection, envelope and fit-out at each site

Questions from US contractors

Edge and telecom building steel: questions and answers

6 answers, grouped by topic.

Rollout programs 3 answers

Can one design be used for many sites?

Yes. The frame layout, details and parts stay the same, and member sizes are checked for each site’s wind, snow and seismic loads before that site is fabricated.

How is a rollout shipped?

In waves. Each building is bundled and marked on its own, so one container or truckload carries one site.

How many sites can you supply?

The plant fabricates 2,500 t of structural steel a month, so a rollout of small buildings can run alongside the larger halls of the same program.

Buildings and loads 3 answers

Can the roof carry condensers or a generator?

Yes. Rooftop equipment sits on dunnage framed into the roof, sized for the weights and vibration data the supplier gives.

Do you supply network hub buildings too?

Yes. A network hub is a larger version of the same building, often with two storeys and heavier floors; we frame it in steel with composite floors.

Which codes do you design to?

To the editions each site’s permit names, typically IBC 2024, ASCE 7-22 and AISC 360. Each site is approved by your Engineer of Record.

Keep reading

Related pages

Price it or partner with us

Send the standard building and the site list.

Share the standard layout, the rooftop equipment and the list of sites with their addresses. We will price the frame per site and the program as a whole.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Tell us about the building

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.

Or call +84 902 881 833

Or leave your project details