Frame
Columns, rafters and bracing from the program’s standard drawings, with member sizes checked for the site.
Rigid frame systems →Large-project capacity
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
| Project | Sector | Where | Structural steel |
|---|---|---|---|
| Sunpro Steel Factory | Steel industry | Can Tho City, Vietnam · 2024 | 5,000 t |
| CPV Food Processing Factory | Food processing | Dong Nai Province, Vietnam · 2020 | 2,500 t |
| Long Son petrochemical | Oil and gas | Ba Ria–Vung Tau, Vietnam · 2022 | 2,000 t |
| M&D warehouse, Thailand | Warehouse and industrial | Thailand · 2024 | 2,000 t |
| Tongwei feed factory, phase 1 | Animal feed | Dong Thap Province, Vietnam · 2018 | 1,500 t |
| New Era cold storage, phase 1 | Cold storage, phase 1 tonnage | Tay Ninh Province, Vietnam | 1,000 t |
One container, one site
The parts repeat from site to site. Only the member sizes that the local loads govern change, and the drawings say so.
Columns, rafters and bracing from the program’s standard drawings, with member sizes checked for the site.
Rigid frame systems →Dunnage for condensers and generators on the roof, and openings for ducts and cable entries.
Mechanical equipment support steel →Ladder tray supports inside and a cable bridge to the generator or the meet-me vault outside.
Cable tray supports →Each building is bundled, marked and loaded on its own, so a crew opens one container and builds one site.
Final release and packing →From our project files
We have framed small buildings erected in Japanese winters, and shipped two small warehouses for Thailand in a single container, bundled building by building. We have no data center or telecom reference yet; these show how a rollout of small buildings is fabricated and packed.
Photo
Photo
Photo
Photo
Scope, in writing
World Steel, our plant in Vietnam
The US contractor, our customer
Questions from US contractors
6 answers, grouped by topic.
Yes. The frame layout, details and parts stay the same, and member sizes are checked for each site’s wind, snow and seismic loads before that site is fabricated.
In waves. Each building is bundled and marked on its own, so one container or truckload carries one site.
The plant fabricates 2,500 t of structural steel a month, so a rollout of small buildings can run alongside the larger halls of the same program.
Yes. Rooftop equipment sits on dunnage framed into the roof, sized for the weights and vibration data the supplier gives.
Yes. A network hub is a larger version of the same building, often with two storeys and heavier floors; we frame it in steel with composite floors.
To the editions each site’s permit names, typically IBC 2024, ASCE 7-22 and AISC 360. Each site is approved by your Engineer of Record.
Keep reading
Price it or partner with us
Share the standard layout, the rooftop equipment and the list of sites with their addresses. We will price the frame per site and the program as a whole.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Tell us about the building
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.
Or call +84 902 881 833