Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Demerara-Mahaica region · Guyana

Steel buildings and structural steel for Demerara-Mahaica, Guyana

Home to Georgetown and the East Bank and East Coast of Demerara, this is Guyana’s busiest region: the capital, the main wharves, the airports, shore bases and most new hotels, offices and housing.

Coastal plain · Regional town Paradise

Site conditions in Demerara-Mahaica

What the site asks of your steel

Ground
Soft clay, long piles
Flood
Below high tide in places
Rain
Two wet seasons
Air
Salt on the sea wall

Our design note. Georgetown’s multi-storey and warehouse projects all sit on soft clay. Light steel frames with composite floors keep pile loads down, and steel lands right at the city’s wharves.

Demerara-Mahaica at a glance

The ground, the work and the route in

Ground and climate

Low coastal clay below high tide in places, protected by the sea wall; the East Bank rises slightly along the Demerara.

What gets built

Government, offshore supply, logistics, retail, hotels, health care, education and housing.

Getting steel there

The Georgetown wharves are here; Cheddi Jagan International Airport on the East Bank.

Communities: Georgetown · Diamond · Providence · Enmore · Mahaica

Steel we recommend

What we fabricate for Demerara-Mahaica

The three building types we are asked for most in this region, made in our own plant in Vietnam and shipped to Georgetown in erection order.

Multi-storey buildings

Steel frames with composite deck for offices, hotels, hospitals and apartments.

Multi-storey steel framing →

Warehouses and shore bases

Clear-span warehouses, laydown sheds and shore base buildings for logistics and oil and gas supply.

Warehouse and distribution buildings →

Commercial buildings

Malls, showrooms, offices and hotels for growing towns.

Commercial steel buildings →

Already in Guyana. We fabricated 18 pedestrian bridges, two warehouses and the steel structure of a mosque in Georgetown in our plant in Vietnam. See the work →

Contractors in Demerara-Mahaica

You win the job in Demerara-Mahaica. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Demerara-Mahaica

Do you supply steel for multi-storey buildings in Georgetown?

Yes. Steel frames with composite deck, light on the piles and fast to erect on tight sites.

Can you supply a shore base on the East Bank?

Yes. Warehouses, laydown sheds, workshops and offices, designed for heavy racking and crane loads.

Coastal plain and beyond

Other regions of Guyana

Georgetown, the sea wall, rice, sugar and most of the people, on land near or below high tide.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, rain, flood and soil values for your site under the Guyana National Building Code. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Guyana

Talk to us about steel for Demerara-Mahaica

Send the drawings or the site, size and use. We design or detail the steel for Demerara-Mahaica’s ground, rain and access, and quote it made in our plant in Vietnam, packed in erection order and shipped to Georgetown. WhatsApp, email or a video call with our engineers, booked at an hour that suits Georgetown. Our contact page for Guyana has the ports, the local time and the form.