Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Barbados · Coatings

Coatings for steel in Barbados’ salt-laden trade winds

Barbados is small and flat enough that the trade winds carry salt from the Atlantic across the whole island. The east coast takes spray straight off the ocean; the west coast hotels sit metres from the sea. Heat and humidity do the rest. For Barbados we choose preparation, coating system and thickness for each exposure and record them member by member.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Bridgetown Port.

Coated members drying in rows on stands in the paint hall
Members drying in the World Steel paint hall in Vietnam after coating.
East coast
Direct Atlantic spray
West and south
Beachfront exposure
Brands
Jotun, PPG, Hempel and more
Option
Hot-dip galvanizing

Exposure

Matching the system to the site

Typical choices for Barbados, confirmed with your engineer for each project.

SiteTypical protection
Inland, enclosed buildingZinc-rich primer and finish coat on sheltered steel
Town near the coastZinc-rich primer, epoxy intermediate, polyurethane finish
Beachfront hotelsMarine-grade high-build system or duplex
East coast and exposed steelHot-dip galvanizing or duplex systems
Canopies and walkwaysGalvanized and painted for looks and life

In our plant

How coating quality is built in

Blast cleaning

Members for Barbados are blast cleaned to the specified grade before priming.

Trained painters

Our painters are trained and certified by the paint manufacturer for the systems they apply to steel bound for Barbados.

Measured film

Dry film thickness measured and recorded for every member shipped to Barbados.

Brands sold locally

Jotun, PPG, Hempel, International Paint and others are sold across the Caribbean, so crews in Barbados can buy them for touch-up.

Barbados

After erection

Every bundle shipped to Bridgetown carries a touch-up note naming the paint system, so your crew repairs handling damage with the same product.

Products and solutions

The World Steel pages behind this guide

Parish by parish

How this applies in your parish

Barbados has 11 parishes. Open St George, St Thomas or St Michael to see the local wind, ground and coast, the road from Bridgetown and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Barbados project is cut, welded, inspected and packed.

Roller conveyor carrying members into a shot-blasting machine
Surface preparation: the automatic shot blaster at the Vietnam plant.
Primed column with its bolted end plate set on painting stands
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Galvanized steel frames with punched bolt plates at the corners on shop trestles
Galvanized frames with their bolt holes open and clean after dipping, Vietnam.
Members in gray finish paint laid out in the paint hall
Gray finish coat applied in the Vietnam paint hall.

Q&A

What Barbadian buyers ask

Does steel need special coatings everywhere in Barbados?

Most sites are coastal in practice, because the trade winds carry salt inland. Your engineer and the owner set the system; enclosed steel needs less than exposed steel.

Should beachfront hotel steel be galvanized?

Exposed steel near the sea often is, or gets a duplex system. Enclosed frames usually take a high-build paint system.

Can we buy matching touch-up paint?

Yes. The brands we use are sold across the Caribbean, and each shipment to Bridgetown names the products.

Contact World Steel · Barbados

Talk to us about steel for Barbados

WhatsApp, email or a video call with our engineers, booked at an hour that suits Bridgetown. Our contact page for Barbados has the ports, the local time and the form.