Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

St Lucy · Parish

Steel buildings and structural steel for St Lucy, Barbados

St Lucy is the quiet northern tip of Barbados: cliffs pounded by the Atlantic at North Point and the Animal Flower Cave, farmland, villages and the calmer north-west coast.

West and north · Main town Checker Hall

Main town
Checker Hall
Group
West and north
Main towns
Checker Hall, Crab Hill, Pie Corner
Port
Bridgetown Port

Site conditions in St Lucy

What the site asks of your steel

Wind
Open Atlantic exposure
Air
Spray on the cliffs
Ground
Limestone, caves
Seismic
Moderate

Our design note. St Lucy needs farm stores, schools and community buildings that stand up to open Atlantic wind. We design for the exposure and galvanize steel near the cliffs.

St Lucy at a glance

The ground, the work and the road in

Ground and climate

Flat coral limestone tableland ending in cliffs on the north and east coasts.

What gets built

Agriculture, housing, schools, small retail and tourism around the north coast sights.

Getting steel there

About an hour from Bridgetown Port via the ABC Highway and Highway 1.

Towns: Checker Hall · Crab Hill · Pie Corner · Connell Town · Animal Flower Cave

Steel we recommend

What we fabricate for St Lucy

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Agricultural buildings

Farm stores, packing houses, poultry houses and agro-processing sheds.

Agricultural steel buildings →

Schools, halls and stadiums

Classrooms, community halls, stands and sports halls that double as shelters.

Sports facilities and arenas →

Warehouses and logistics

Clear-span warehouses and distribution centers with docks, mezzanines and racking loads.

Warehouse and distribution buildings →

Contractors in St Lucy

You win the job in St Lucy. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in St Lucy

Is St Lucy windier than the rest of the island?

Its north and east coasts face the open Atlantic, so exposure is high. Your engineer sets the values for the site.

Can you supply farm buildings?

Yes. Stores, packing sheds and poultry houses, shipped as complete steel kits.

West and north

Other parishes in the west and north

The Platinum Coast of St James and St Peter, and St Lucy at the island’s northern tip.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Barbados. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Barbados

Talk to us about steel for St Lucy

Send the drawings or the site, size and use. We design or detail the steel for St Lucy’s hurricane, seismic and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Bridgetown Port. WhatsApp, email or a video call with our engineers, booked at an hour that suits Bridgetown. Our contact page for Barbados has the ports, the local time and the form.