Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

St James · Parish

Steel buildings and structural steel for St James, Barbados

St James is the heart of the Platinum Coast: luxury hotels, villas and golf estates on the calm Caribbean side, and Holetown, where the first English settlers landed in 1627.

West and north · Main town Holetown

Main town
Holetown
Group
West and north
Main towns
Holetown, Sandy Lane, Paynes Bay
Port
Bridgetown Port

Site conditions in St James

What the site asks of your steel

Wind
Storms from the south and west
Air
Beachfront salt
Site
Narrow coast road
Seismic
Moderate

Our design note. Platinum Coast hotels and villas need wind-rated frames, marine coatings and steel delivered in short pieces along a narrow coast road. We plan splices for the route.

St James at a glance

The ground, the work and the road in

Ground and climate

Coral terraces stepping down to the sheltered west coast beaches; gullies cut the slopes inland.

What gets built

Luxury hotels, villas, golf resorts, restaurants, retail in Holetown and housing inland.

Getting steel there

Thirty to forty-five minutes north of Bridgetown Port on Highway 1, narrow in places near the coast.

Towns: Holetown · Sandy Lane · Paynes Bay · Prospect · Westmoreland

Steel we recommend

What we fabricate for St James

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Hotels and resorts

Multi-storey frames, long-span lobbies and roofs, villas and service buildings for tourism.

Multi-story steel buildings →

Multi-storey buildings

Steel frames with composite deck for offices, hospitals and apartments.

Multi-storey steel framing →

Malls and commercial buildings

Supermarkets, showrooms, retail plazas and office blocks.

Commercial steel buildings →

Contractors in St James

You win the job in St James. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in St James

Can steel reach beachfront sites in St James?

Yes. We split long members at bolted splices so trucks can use the coast road and small cranes can place them.

Is steel suitable for luxury hotels?

Yes. Steel frames with composite floors give long, open spans and finish to any architectural standard.

West and north

Other parishes in the west and north

The Platinum Coast of St James and St Peter, and St Lucy at the island’s northern tip.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Barbados. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Barbados

Talk to us about steel for St James

Send the drawings or the site, size and use. We design or detail the steel for St James’s hurricane, seismic and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Bridgetown Port. WhatsApp, email or a video call with our engineers, booked at an hour that suits Bridgetown. Our contact page for Barbados has the ports, the local time and the form.