Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

St John · Parish

Steel buildings and structural steel for St John, Barbados

St John sits on the high eastern edge of the coral uplands, with Hackleton’s Cliff and Codrington College looking over the Atlantic and the fishing village of Martin’s Bay below.

East · Main town Four Roads

Main town
Four Roads
Group
East
Main towns
Four Roads, Codrington College, Martin’s Bay
Port
Bridgetown Port

Site conditions in St John

What the site asks of your steel

Wind
Clifftop speed-up
Air
Atlantic salt
Ground
Limestone, clay below
Seismic
Moderate

Our design note. St John’s schools, farm buildings and utility sheds need design for clifftop wind and salt. We work with your engineer on exposure and coatings for each site.

St John at a glance

The ground, the work and the road in

Ground and climate

Limestone uplands ending in Hackleton’s Cliff, with clay below on the coast.

What gets built

Agriculture, education, small communities and water supply works.

Getting steel there

About fifty minutes from Bridgetown Port across the island.

Towns: Four Roads · Codrington College · Martin’s Bay · Bowmanston · Gall Hill

Steel we recommend

What we fabricate for St John

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Schools, halls and stadiums

Classrooms, community halls, stands and sports halls that double as shelters.

Sports facilities and arenas →

Agricultural buildings

Farm stores, packing houses, poultry houses and agro-processing sheds.

Agricultural steel buildings →

Energy and utilities

Solar carports, plant buildings, tank and pipe supports, workshops.

Energy and power utilities →

Contractors in St John

You win the job in St John. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in St John

Do clifftop sites need special design?

Yes. Cliffs speed up the wind, and the exposure is open Atlantic. Your engineer sets the values.

Can you supply utility buildings?

Yes. Pump houses, workshops and stores, with coatings for the salt air.

East

Other parishes in the east

The Atlantic side: the Scotland District hills, Bathsheba and the cliffs and plains of St Philip.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Barbados. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Barbados

Talk to us about steel for St John

Send the drawings or the site, size and use. We design or detail the steel for St John’s hurricane, seismic and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Bridgetown Port. WhatsApp, email or a video call with our engineers, booked at an hour that suits Bridgetown. Our contact page for Barbados has the ports, the local time and the form.