Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Drone view across the World Steel plant: office block in front, fabrication halls behind

The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

Complete building

Tell us the use, the site and the size. We shape the steel package.

No drawings yet? Start with what the building is for, where it stands and roughly how big it is. We design the steel package around it and list what World Steel supplies and what stays local.

Use
State
Rough size

I need a complete building

Fields marked * are required. It takes a few minutes.

You and your company
The project
Message and files

Products in your request

Hot-Dip Galvanizing
VICTOR Dang, Global Sales Director, World Steel Group

Your direct line at World Steel

VICTOR Dang

Global Sales Director, World Steel Group

View Victor’s profile

Package level

Choose how much of the building we supply

Each level adds to the one before it. Not sure? Pick “Not sure” in the form and we explain the options in your scope of supply.

Whatever the level, the steel is designed to your code basis, with calculations and drawings ready for your Engineer of Record, and shop drawings included.

  1. Structural framePrimary and secondary steel, connections and bolts.
  2. Building shellThe frame plus roof and wall cladding, trims and flashings.
  3. Coordinated complete supplyThe shell plus doors, windows, skylights and accessories, shipped together.
  4. Custom engineeredLong spans, cranes, mezzanines or multi-story frames designed for the job.

Size it first in the building builder

Set spans, length and height online, see the scope it implies, and attach that configuration to this form.

Open the builder

Before you send

Questions contractors ask first

Something else? Write it in the message box and an engineer answers with your quote.

Can I quote without drawings?

Yes. A use, a state and a rough size are enough for a first scope. We design the frame to your code basis and send calculations and drawings ready for your Engineer of Record.

Which package level should I choose?

Choose "Not sure" if you are unsure. Most US contractors start with the building shell and source local trades for the rest; we explain each option in the scope.

Can I try the size first?

Yes. The online building builder gives a quick picture of the scope, and you can attach that configuration to this form.