Your matched steel package
Sports, Recreation & Community Facilities
Treat these as a first pass pulled from our reviewed engineering content. Your Engineer of Record confirms the structural design, and your local building department decides on code compliance and the permit.
Framing approaches to consider
- Long-span structural steel
- Custom roof trusses
- Exposed architectural steel
- Entry canopies
Points your engineer will check
Long roofs over assembly spaces are checked for uplift, ponding, snow drift and deflection.
From: Sports, Recreation & Community Facilities
Halls designated as storm shelters may require ICC 500 design and a higher risk category.
From: Sports, Recreation & Community Facilities
Exposed trusses are detailed with the architect for appearance and future maintenance.
From: Sports, Recreation & Community Facilities
Components to include
Systems in scope
Services that apply
Guides to read next
Comparable buildings
What happens next
- Share drawings, a sketch or simply the footprint and ZIP code.
- We agree the design loads with your Engineer of Record and draft a package scope.
- You get a written proposal listing what is in, what is out and the Incoterm.
Adjust your answers
Bidding a large US project?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.