Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Orange Walk · District

Steel buildings and structural steel for Orange Walk, Belize

Orange Walk is sugar country. Cane fields stretch along the New River to the sugar mill at Tower Hill, and Mennonite farms grow grain and raise poultry around Shipyard and Blue Creek.

North · District town Orange Walk Town

District town
Orange Walk Town
Group
North
Main towns
Orange Walk Town, Tower Hill, San Estevan
Port
Belize City

Site conditions in Orange Walk

What the site asks of your steel

Wind
Open plains
Flood
New River and lagoons
Ground
Limestone and clay
Seismic
Low

Our design note. Sugar mill buildings, grain stores and poultry houses in Orange Walk need wide, clear spans and frames for plant loads. We design for the open-plains wind and ship complete kits.

Orange Walk at a glance

The ground, the work and the road in

Ground and climate

Flat limestone and clay plains along the New River; wetlands and lagoons in places.

What gets built

Sugar cane and the sugar mill, grain, poultry and dairy, commerce and services in Orange Walk Town.

Getting steel there

About one hour north of the Port of Belize on the Philip Goldson Highway.

Towns: Orange Walk Town · Tower Hill · San Estevan · Trial Farm · Shipyard

Steel we recommend

What we fabricate for Orange Walk

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Agro-processing plants

Portal frames and crane bays for sugar, citrus, banana and food plants.

Manufacturing plants and crane bays →

Agricultural buildings

Grain stores, packing houses, poultry houses and machinery sheds.

Agricultural steel buildings →

Warehouses and logistics

Clear-span warehouses and distribution centers with docks, mezzanines and racking loads.

Warehouse and distribution buildings →

Contractors in Orange Walk

You win the job in Orange Walk. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Orange Walk

Can you supply steel for sugar mill buildings?

Yes. Process buildings, crane bays, platforms and conveyor supports for the loads your engineer sets.

Can you supply poultry houses and grain stores?

Yes. Long, clear-span farm buildings shipped as complete steel kits.

North

Other districts: north

Corozal and Orange Walk: sugar cane country on the Mexican border and the New River.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Belize. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Belize

Talk to us about steel for Orange Walk

Send the drawings or the site, size and use. We design or detail the steel for Orange Walk’s hurricane, flood and soft-ground conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Belize City. WhatsApp, email or a video call with our engineers, booked at an hour that suits Belmopan. Our contact page for Belize has the ports, the local time and the form.