Your direct line at World Steel
VICTOR Dang
Global Sales Director, World Steel Group
View Victor’s profileRequest types
Four ways our engineers work with your design team
Choose the request in the form. A World Steel engineer, not a salesperson, writes back.
Technical question
Framing, loads, connections, coatings or fabrication limits.
Delegated design proposal
Metal building design by World Steel for your Engineer of Record to review and approve.
Specification support
Section and coating data for the steel section of your specification.
BIM and IFC coordination
Tekla Structures models exchanged as IFC with your design model.
Delegated design comes as calculations and drawings ready for your engineer’s review and approval. The seal and the permit stay with the US contractor, our customer, and their Engineer of Record.
Capacity for large jobs
The plant behind your quote has already built these
2,500 metric tons (about 2,750 short tons) of structural steel a month, from our own IAS AC472-accredited plant in Vietnam. Each job below was designed, detailed, fabricated and shipped by World Steel.
-
5,000 t about 5,500 short tons
Sunpro Steel Factory
Steel industryCan Tho City, Vietnam · 2024
-
2,500 t about 2,750 short tons
CPV Food Processing Factory
Food processingDong Nai Province, Vietnam · 2020
-
2,000 t about 2,200 short tons
Long Son petrochemical complex
Oil and gasBa Ria–Vung Tau, Vietnam · 2022
-
2,000 t about 2,200 short tons
M&D (MD Factory)
Warehouse and industrialThailand · 2024
-
1,500 t about 1,650 short tons
Tongwei Tien Giang feed factory, phase 1
Animal feedDong Thap Province, Vietnam · 2018
-
1,000 t about 1,100 short tons
New Era cold storage
Cold storage, phase 1 tonnageTay Ninh Province, Vietnam
Before you send
Questions contractors ask first
Something else? Write it in the message box and an engineer answers with your quote.
Do you seal delegated design?
No. World Steel prepares calculations and drawings ready for your Engineer of Record’s review and approval. The seal and the permit stay with the US contractor, our customer, and their engineer.
Which codes do you design to?
We design to the code basis the job names, commonly the IBC with ASCE 7 loads, AISC 360 and AISC 341 for steel, and MBMA practice for metal building systems.
Can we exchange models?
Yes. Our detailing is done in Tekla Structures, and we exchange IFC models with your design team for coordination.
Not quite your project? Pick another route
- I have a bid package for a large jobYou are bidding a large job and have the bid documents.
- I am a contractorYou are a GC, design-builder, EPC or erector pricing steel or looking for a long-term fabricator.
- I have drawingsYou have a permit set, IFC model or sketches.
- I need a complete buildingYou know the use, the site and a rough size, but not the steel yet.
- I need Value EngineeringYou have a design and want steel or freight taken out of it.
- I need corrosion protectionYour site sees salt air, de-icing salt, fertilizer or fumes.
- I need federal supply supportThe job is publicly funded or on a federal site.
- All quote routes