Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Suriname industrial estates · Suzannasdaal

Steel buildings for the Suzannasdaal shore base

On the former Suzannasdaal plantation in Commewijne, across the river from Paramaribo, DP World and its partners drove the first pole in 2022 for a 50 ha offshore support base with a 500 m quay and 8.5 m of guaranteed depth at low water, plus 330 ha of land for a marine industrial park. Offshore supply firms need warehouses, workshops and yard buildings. We design them to your engineer’s code basis, fabricate them in our IAS AC472 accredited plant in Vietnam at 2,500 t a month and ship them CIF Paramaribo.

Suzannasdaal, from public reports

50 ha
offshore support base
500 m
quay, 8.5 m at low water
330 ha
estate for expansion

2,500 t a month of structural steel from our own plant, FOB Vietnam or CIF Paramaribo.

The base

A river quay for offshore supply

On CIF Paramaribo, our steel arrives up the Suriname River, and the base sits on the same estuary. Your broker clears it and bundles go to your lot labelled by building and area, in erection order.

Base50 haoffshore support base (DP World)
Quay500 m8.5 m guaranteed depth at low water
Expansion330 haand 1 km of waterfront
Offshore≈200 kmfrom the oil discoveries

Base story

From plantation to shore base

What 2022 public reports say about the project.

  1. 2022

    First pole

    The President gives the start signal on 24 August.

  2. 2022

    Partners

    FIRM Engineering, HJ De Vries Project Development and DP World.

  3. 2023

    Phase 1

    Planned to be ready by mid-2023.

  4. Next

    Marine park

    330 ha of estate for a marine industrial park.

Sources: DP World news, Office of the President of Suriname (24 August 2022). Dates are as planned in 2022.

Buildings

What a shore base builds

Offshore supply firms order these buildings; each links to the World Steel package behind it.

Clay and rain

Steel for soft clay and heavy rain

The base sits on reclaimed river land with soft clay and heavy tropical rain. Your engineer sets the ground and load basis; we keep the frame light, set column reactions early and size roofs and gutters for the rain.

  • Light frames for soft ground
  • Column reactions sent early
  • Gutters sized for heavy rain
  • Coatings for humid river air

Delivery

From the Vietnamese port to Suzannasdaal

Our CIF terms land the steel at Paramaribo. From there it crosses the river to Commewijne.

  1. Our plantPacked in erection order
  2. At seaAbout 45 days to Paramaribo, typical sailing
  3. ParamariboCleared by your broker
  4. Across the riverOver the bridge to Commewijne
  5. The baseUnloaded at your lot

From our plant

Crane columns, girders, blasting and packing

Real World Steel photos from our plant and projects in Vietnam. None is shown as a Suriname site.

1
1
1
1

Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.

Large-project capacity

Built for the biggest jobs on any Suriname estate

Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.

5,000 tSunpro Steel mill
2,500 tCPV Food plant
2,000 tLong Son oil and gas, 56,000+ m²
2,000 tM&D Warehouse, Thailand
20projects already shipped to Guyana

Questions

Questions on steel buildings at the Suzannasdaal shore base

Where is the Suzannasdaal shore base?

On the former Suzannasdaal plantation in Commewijne, across the Suriname River from Paramaribo, about 200 km from the offshore oil finds, according to DP World.

How big is it?

A 50 ha offshore support base with a 500 m quay and 8.5 m of guaranteed depth at low water, plus 330 ha and 1 km of waterfront for expansion.

Can you make shore base workshops?

Yes. We design and fabricate crane halls, supply stores, yard canopies and offices, and we supply overhead cranes with the building on request.

Do you design for soft ground?

Yes. Your engineer of record sets the ground basis; we keep the frame light and send column reactions early.

Do you erect the buildings?

No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.

How does steel reach Suzannasdaal?

By sea to Paramaribo, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then across the river. We supply FOB Vietnam or CIF Paramaribo.

Building at the Suzannasdaal shore base?

Send the lot, the use and your engineer’s code basis. We design, fabricate and ship CIF Paramaribo.