Workshops
Heavy halls with crane runways for subsea and drilling kit.
Crane runway beamsThe base
On CIF Paramaribo, our steel arrives up the Suriname River, and the base sits on the same estuary. Your broker clears it and bundles go to your lot labelled by building and area, in erection order.
Base story
What 2022 public reports say about the project.
The President gives the start signal on 24 August.
FIRM Engineering, HJ De Vries Project Development and DP World.
Planned to be ready by mid-2023.
330 ha of estate for a marine industrial park.
Sources: DP World news, Office of the President of Suriname (24 August 2022). Dates are as planned in 2022.
Buildings
Offshore supply firms order these buildings; each links to the World Steel package behind it.
Heavy halls with crane runways for subsea and drilling kit.
Crane runway beamsClear-span stores for pipe, tools and supplies.
Warehouse buildingsCanopies and pipe racks for open yard storage.
Oil and gas steelMulti-storey steel frames for base offices.
Multi-storey steel framingClay and rain
The base sits on reclaimed river land with soft clay and heavy tropical rain. Your engineer sets the ground and load basis; we keep the frame light, set column reactions early and size roofs and gutters for the rain.
Delivery
Our CIF terms land the steel at Paramaribo. From there it crosses the river to Commewijne.
From our plant
Real World Steel photos from our plant and projects in Vietnam. None is shown as a Suriname site.
Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.
Suriname industrial estates
Each estate has its own lots, ground and tenants, so each has its own guide.
Large-project capacity
Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.
Questions
On the former Suzannasdaal plantation in Commewijne, across the Suriname River from Paramaribo, about 200 km from the offshore oil finds, according to DP World.
A 50 ha offshore support base with a 500 m quay and 8.5 m of guaranteed depth at low water, plus 330 ha and 1 km of waterfront for expansion.
Yes. We design and fabricate crane halls, supply stores, yard canopies and offices, and we supply overhead cranes with the building on request.
Yes. Your engineer of record sets the ground basis; we keep the frame light and send column reactions early.
No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.
By sea to Paramaribo, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then across the river. We supply FOB Vietnam or CIF Paramaribo.
Send the lot, the use and your engineer’s code basis. We design, fabricate and ship CIF Paramaribo.