Allocation
An initial 1,500 ha (3,707 acres) for the special economic zone.
Zone profile
What 2021 and 2023 public reports say about the plan.
An initial 1,500 ha (3,707 acres) for the special economic zone.
15 ha port area, a 250 m quay and 4.5 m draft at low water.
Planned over 30 years, with the Port of Rotterdam as adviser.
A 2021 agreement to develop a deepwater port and zone in the west.
Sources: Havenbeheer Suriname SEOGS brochure (2023), Offshore Magazine (29 November 2021). The zone is planned; check its status and land with the port company.
Building sizes
Illustrative sizes. We set the real building to your lot, your use and your engineer’s basis.
36 m × 90 m (118 × 295 ft)
3,240 m² with docks
30 m × 60 m (98 × 197 ft)
1,800 m² for agro or light industry
24 m × 42 m (79 × 138 ft)
1,008 m² with a crane bay
Buildings
Each building type links to the World Steel product or package behind it.
Clear-span sheds for cargo through Nickerie.
Warehouse buildingsHalls and stores for rice and farm produce.
Agriculture and food processingWorkshops with crane bays for port and energy work.
Crane runway beamsSteel frames for zone and customs offices.
Multi-storey steel framingClay and rain
Nickerie lies on Suriname’s flat coastal plain, with soft clay and heavy rain. Your engineer sets the ground and load basis; we keep frames light, send column reactions early and size roofs and gutters for the rain.
Delivery
Our CIF terms land the steel at Paramaribo. From there it runs west along the coast road to Nickerie.
From our plant
Real World Steel photos from our plant and projects in Vietnam. None is shown as a Nickerie site.
Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.
Suriname industrial estates
Each estate has its own lots, ground and tenants, so each has its own guide.
Large-project capacity
Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.
Questions
A planned zone at the Port of Nickerie in western Suriname, with an initial allocation of 1,500 ha and a 30-year masterplan advised by the Port of Rotterdam, according to the port company.
It is planned. The port today has a 15 ha area, a 250 m quay and 4.5 m draft. Check the zone’s status and land with the port company.
Yes. We design and fabricate port sheds, processing halls, workshops and offices for the lot you hold.
Yes. Your engineer of record sets the ground and rainfall basis; we design light frames, roofs and gutters to it.
No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.
By sea to Paramaribo, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then west by road. We supply FOB Vietnam or CIF Paramaribo.
Send the lot, the use and your engineer’s code basis. We design, fabricate and ship CIF Paramaribo.