Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Connections & anchorage · Cleats

Hundreds of small plates, each in exactly the right place

A rafter may carry twenty purlin cleats, a column a dozen girt clips. Each is small, but each has to sit at exactly the right height and angle, or the purlins and girts will not line up. We weld every cleat in our shop from the shop drawings and check positions before shipping, so the crew on site only bolts.

IllustrationPurlin cleats along a rafter, positions checked before shipping.

Why it pays

Small parts, straight buildings

  • Positions checked

    Purlins and girts line up.

  • Bolt-only site work

    No field welding of cleats.

  • Straight lines

    Roof and walls stay true.

  • Shop quality

    Welded and inspected in the plant.

How it is made

Located, welded, checked

  1. Located on drawingsHeight, angle, holes.
  2. Welded onFrom templates and drawings.
  3. Positions checkedBefore shipping.
Quality inspector taking dimensions on a finished steel memberPhoto
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Fitter comparing a built-up beam with its shop drawingPhoto
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.

Specification

Cleats at a glance

Types
Plate cleats and clip angles
Use
Bolting points for purlins, girts, beams and bracing
Location
Positioned from the shop drawings, checked before shipping
Welding
Shop-welded under qualified welding procedures
Holes
Punched or drilled to the bolt pattern
Finish
With the member it is welded to

Where it goes

On every frame line

Questions

Cleat questions

What is the difference between a cleat and a bracket?

A cleat is a small bolting point for a secondary member like a purlin. A bracket carries a real load off the frame, like a crane runway or canopy.

What if a cleat is in the wrong place?

We check positions in the shop before shipping to avoid that. If one is found on site, your contractor and their Engineer of Record decide the fix.

Are cleats welded or bolted to the frame?

Welded in our shop. Purlins and girts then bolt to them on site.

Next step

Price it, or build with us for the long run

Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.

Request a quote for Cleats

Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.

Become our partner in the US

Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.

Drawn illustration of connections & anchorage, standing in for a photo of this product Illustration

Catalog record Verified

Sized by our engineers for your loads and code, then listed line by line in your quote.