Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Packing houses

Packing houses: built around the line

A packing house is a line: field bins arrive at one end, fruit and vegetables are washed, graded and packed, then sit in a cold room until the truck leaves. The building has to keep the line clear of columns, stand up to wash-down every day and hold the cold. Our plant fabricates 2,500 t of structural steel a month, and we framed the CPV Food processing plant in Vietnam with about 2,500 t.

Packed under
a steel roof
FRAME BY WORLD STEEL
  • Receiving
  • Washing
  • Grading and packing
  • Cold room
  • Dispatch

Large-project capacity

A packing house and its cold rooms, from one plant

World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.

2,500 metric tons a month

ProjectSectorWhereStructural steel
Sunpro Steel FactorySteel industryCan Tho City, Vietnam · 20245,000 t
CPV Food Processing FactoryFood processingDong Nai Province, Vietnam · 20202,500 t
Long Son petrochemicalOil and gasBa Ria–Vung Tau, Vietnam · 20222,000 t
M&D warehouse, ThailandWarehouse and industrialThailand · 20242,000 t
Tongwei feed factory, phase 1Animal feedDong Thap Province, Vietnam · 20181,500 t
New Era cold storage, phase 1Cold storage, phase 1 tonnageTay Ninh Province, Vietnam1,000 t

Follow the crate

Five stations, and what the building does at each

Pick a station to move the crate along the line.

Receiving

A covered bay where field bins come off trucks and forklifts, with a canopy deep enough to keep the sun off the fruit.

Loading dock canopies →

Washing

A wet zone with drains in the slab and steel kept out of the splash where it can be, coated for daily wash-down.

Epoxy coatings →

Grading and packing

A clear-span hall around the grading line, with supports for lights, conveyors and hoppers framed in the roof.

Long-span steel structures →

Cold room

Insulated panel rooms inside or beside the hall, with the frame designed for the panel and refrigeration loads.

Insulated metal panels →

Dispatch

Dock doors and a canopy where pallets leave cold, without crossing the receiving traffic.

Loading bay structures →

Clean, wet and cold

Steel that lives with wash-down and cold rooms

Wash-down every day

Coatings, fasteners and details are chosen for water and cleaning chemicals, and girts and purlins inside the clean zone are kept to a minimum.

Fewer ledges for dust

Members over the line are detailed to shed water and dust, and the clean zone is closed off with panels where the food-safety plan asks for it.

Cold rooms that stay cold

The frame carries the insulated panels and the refrigeration units, with thermal breaks where steel passes through the cold envelope.

From our project files

CPV Food processing plant, about 2,500 t

A food plant in Dong Nai, Vietnam (2020), framed with long-span trusses so the process lines and cold rooms sit on a clear floor. We do not have a US packing house reference yet.

See the project
Aerial view across the CPV Food processing plant site in Dong Nai, Vietnam Photo
Mobile cranes lifting long-span steel trusses at the CPV Food plant Photo
Rows of steel trusses on columns over the future process hall at the CPV Food plant Photo
Looking along the long-span steel trusses of the CPV Food processing hall Photo

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Packing hall frame, canopies, cold room support steel, dock framing and roof equipment supports designed to the contract documents
  • Coating systems for wash-down zones, from epoxy systems to galvanizing by an outside galvanizer in Vietnam
  • Shop and erection drawings at no extra cost, ready for your Engineer of Record
  • Fabrication in our IAS AC472-accredited plant in Vietnam, tracked live in PEB Studio

The US contractor, our customer

  • Drawing approval, the PE seal and the permit with your Engineer of Record
  • Packing lines, refrigeration and the food-safety plan and audits
  • Slab, drains, foundations and utilities
  • Erection, envelope, dock equipment and fit-out

Questions from US contractors

Packing house steel: questions and answers

6 answers, grouped by topic.

Packing hall and line 3 answers

How wide can the packing hall be without columns?

The span is designed around the line layout the owner gives us. Long-span trusses like those at the CPV Food plant keep the floor clear for lines and forklifts.

Can the roof carry conveyors and lights over the line?

Yes. Supports for lights, conveyors, hoppers and fans are designed with the frame and drilled in the shop.

Do you supply cold rooms?

We supply the steel that carries the cold room panels and refrigeration units, and the insulated panels where the package includes them. Refrigeration is by others.

Food plants and references 3 answers

How is steel protected in wash-down areas?

With a coating system chosen for water and cleaning chemicals, often an epoxy system or galvanizing, and details that do not trap water. The design team sets the system.

Have you built food plants?

Yes. We framed the CPV Food processing plant in Dong Nai, Vietnam, with about 2,500 t of steel in 2020, and feed plants for Haid Group and Tongwei. We do not have a US packing house reference yet.

Is your plant food-safety certified?

No. Food-safety certification belongs to the packing house and its operator. Our plant holds IAS AC472 accreditation for steel fabrication.

Keep reading

Related pages

Price it or partner with us

Send the line layout and the cold rooms.

Share the packing line, the cold rooms, the docks and the canopies. We will price the hall and its rooms together.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Tell us about the building

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.

Or call +84 902 881 833

Or leave your project details