Why it pays
Fittings that keep a drainage system flowing
Nothing missing
Counted from the layout.
No leaks or blocks
Every fitting in place.
Storm-ready
Overflow paths planned.
Packed together
With the gutters.
Specification
Rainwater accessories at a glance
- Parts
- Outlets, strainers, end caps, expansion joints, overflows, brackets
- Material
- Coated steel to match the gutters, or as specified
- Count
- From the drainage layout on the drawings
- Overflow
- Per IBC Chapter 15 and the plumbing code, sized by your project engineer
- Sealant
- Supplied for gutter joints
- Supply
- Packed with the gutters
- Layout drawnOutlets and joints placed.
- Fittings countedPer gutter run.
- Packed by runReady to install.
Where they go
Complete drainage on every roof
- GuttersComplete the gutter system.
- DownspoutsOutlets and elbows.
- Florida projectsHeavy storms need overflows.
Photo
PhotoQuestions
Accessory questions
Why do long gutters need expansion joints?
Steel grows and shrinks with temperature. On long runs, expansion joints let it move without tearing seams.
Do I need overflows?
The building code requires a secondary path for water when storms exceed the design. Your project engineer sizes it; we supply the fittings.
Are strainers worth it?
Yes, where trees or debris are near. They keep downspouts from blocking.
More drainage and weather protection: Gutters · Downspouts · Flashings · Ridge Closures · Eave Trims · Canopies · Entrance Covers · Loading Dock Canopies
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Rainwater Accessories
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions
Covered in our state guides