Four interfaces
Every edge where two trades meet
- Base to slabBase trims and sealant where wall panels meet concrete.
- Steel to masonryCounter-flashings and tapes against block or brick walls.
- New to existingExpansion joints where a new building joins an old one.
- Steel to other tradesInterfaces with curtain walls, roofs and equipment.
Why it pays
The seam is where buildings leak
No leaks at edges
Where most leaks start.
Planned joints
Drawn before shipping.
Movement allowed
Materials move differently.
Supplied together
With the steel.
- Parts
- Membranes, sealing tapes, base trims, counter-flashings
- Detailing
- Each interface drawn on the shop drawings
- Movement
- Joints detailed for the movement between materials
- Compatibility
- Products chosen to suit the materials joined
- Performance
- Product data confirmed per project
- Supply
- With the steel package
How it works
Drawn on the shop drawings, packed with the building
- Interfaces foundEvery edge with another material.
- Details drawnOn the shop drawings.
- Materials shippedLabeled by interface.
Photo
PhotoQuestions
Interface questions
Who installs the waterproofing?
Your US contractor or the trade they assign, from the details on our drawings.
Can you tie a new building into an existing one?
Yes. We detail an expansion joint and the sealing so the two buildings can move separately.
Which membrane products do you use?
Products are chosen to suit the materials joined and named in the project quote, with data confirmed per project.
More drainage and weather protection: Gutters · Downspouts · Flashings · Ridge Closures · Eave Trims · Rainwater Accessories · Canopies · Entrance Covers
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Waterproofing Interface Components
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions
Covered in our state guides