Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

British Virgin Islands · Coatings

Coatings for steel in the salt air of the BVI

Life in the British Virgin Islands happens at the water’s edge: marinas and boatyards around Road Harbour and the North Sound, resorts on white-sand bays, and homes on slopes facing the channel. Salt reaches every site on islands this small, and splash and spray hit marina steel daily. For the British Virgin Islands we choose preparation, coating system and thickness for each exposure and record them member by member.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Road Town.

Coated members drying in rows on stands in the paint hall
Members drying in the World Steel paint hall in Vietnam after coating.
Marinas
Splash and spray
Everywhere
Salt in the wind
Brands
Jotun, PPG, Hempel and more
Option
Hot-dip galvanizing

Exposure

Matching the system to the site

Typical choices for the British Virgin Islands, confirmed with your engineer for each project.

SiteTypical protection
Enclosed, air-conditioned buildingZinc-rich primer and finish coat on sheltered steel
Road Town and hillside sitesZinc-rich primer, epoxy intermediate, polyurethane finish
Beach resorts and villasMarine-grade high-build system or duplex
Marinas and boatyardsDuplex systems for splash and spray
Anegada and the small islandsHot-dip galvanizing or duplex systems

In our plant

How coating quality is built in

Blast cleaning

Members for the British Virgin Islands are blast cleaned to the specified grade before priming.

Trained painters

Our painters are trained and certified by the paint manufacturer for the systems they apply to steel bound for the British Virgin Islands.

Measured film

Dry film thickness measured and recorded for every member shipped to the British Virgin Islands.

Brands sold locally

Jotun, PPG, Hempel, International Paint and others are sold across the Caribbean, so crews in the British Virgin Islands can buy them for touch-up.

British Virgin Islands

After erection

Every bundle shipped to Road Town carries a touch-up note naming the paint system, so your crew repairs handling damage with the same product.

Products and solutions

The World Steel pages behind this guide

Island by island

How this applies in your island

The British Virgin Islands have 5 islands. Open Beef Island, Peter Island and more, Tortola or Virgin Gorda to see the local wind, ground and coast, the road from Road Town and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your BVI project is cut, welded, inspected and packed.

Roller conveyor carrying members into a shot-blasting machine
Surface preparation: the automatic shot blaster at the Vietnam plant.
Primed column with its bolted end plate set on painting stands
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Galvanized poles and channels with wrapped flanges stacked in a yard
Galvanized tower members with their flanges wrapped for shipping, Vietnam.
Members in gray finish paint laid out in the paint hall
Gray finish coat applied in the Vietnam paint hall.

Q&A

What Virgin Islander buyers ask

What coating suits a boat shed?

Marina buildings usually get galvanizing or a duplex system, because splash and spray reach the lower steel every day.

Do enclosed buildings need marine coatings?

Usually less: enclosed, air-conditioned steel takes a lighter system than steel exposed to the weather. Your engineer and the owner set it.

Can we buy matching touch-up paint?

Yes. The brands we use are sold across the Caribbean, and each shipment to Road Town names the products.

Contact World Steel · British Virgin Islands

Talk to us about steel for the British Virgin Islands

WhatsApp, email or a video call with our engineers, booked at an hour that suits Road Town. Our contact page for the British Virgin Islands has the ports, the local time and the form.