Project types
What we fabricate for the BVI
Schools and shelters
Classrooms and halls designed to the shelter risk category.
Clinics and hospitals
Composite frames for health buildings.
Government offices
Composite multi-storey frames.
Resorts and villas
Resort buildings and villa frames.
Marina buildings
Boat sheds, workshops and service buildings.
Airport buildings
Terminal, hangar and cargo frames.
Speed
Built fast, before the next season
We fabricate while your site builds the foundations, then ship in erection order so frames rise area by area. Composite deck replaces most formwork, and the building closes in before the next hurricane season.
Large packages are released by building or by area. Our references include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.
Who does what
Project work, split clearly
World Steel supplies
- Steel design or detailing to the Virgin Islands building code
- Fabrication, coating and QC release
- Composite deck, studs and secondary steel
- Packing by building and shipping to Road Town
- Shop and erection drawings, included
The contractor arranges
- Owner contract and approvals
- Engineer of record approval
- Foundations and anchor bolts
- Erection and concrete topping
- Finishes, services and fit-out
Products and solutions
The World Steel pages behind this guide
Island by island
How this applies in your island
The British Virgin Islands have 5 islands. Open Tortola, Virgin Gorda or Anegada to see the local wind, ground and coast, the road from Road Town and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your BVI project is cut, welded, inspected and packed.
Q&A
What Virgin Islander buyers ask
Can you supply a programme of school and clinic buildings?
Yes. We release packages building by building from one plant, with one set of drawings and one tracking system.
Can you supply marina and boatyard buildings?
Yes. Boat sheds, workshops and service buildings with coatings for splash and spray.
Do you work with local contractors?
Yes. Contractors in the British Virgin Islands are our customers: they win the work and erect it, and we design, fabricate and supply the steel.
British Virgin Islands solutions
Every British Virgin Islands guide
Related pages
Code facts on this page summarize practice in the British Virgin Islands and the standards it references. They are not legal or engineering advice; your engineer of record and the planning and building authorities confirm the code and edition in force for your project.
Contact World Steel · British Virgin Islands
Talk to us about steel for the British Virgin Islands
WhatsApp, email or a video call with our engineers, booked at an hour that suits Road Town. Our contact page for the British Virgin Islands has the ports, the local time and the form.