Where wind wins
Four places we check first
Roof uplift
On roofs in the British Virgin Islands, edge and corner zones carry much more suction than the middle.
Large openings
A failed door or window pressurizes the building; we design for it.
Connections
Purlin cleats, flange braces and anchors carry reversing storm loads.
Ridges and saddles
Tortola’s ridges and the saddles between them speed wind up sharply.
By site
How the site changes the wind on your steel
Your engineer of record in the British Virgin Islands confirms the values.
| Site | What changes |
|---|---|
| Tortola ridge and hillside sites | Strong topographic speed-up |
| Road Harbour and the south shore | Open channel exposure and surge |
| Tortola north shore | Open Atlantic swell and wind |
| Anegada | Flat, low island with no shelter |
| Virgin Gorda and the small islands | Open exposure on every side |
Shelters
Buildings that shelter people
Schools and halls
Many serve as hurricane shelters and need a higher risk category.
Protected openings
Doors, shutters and glazing designed with the frame.
Back-up power
Steel supports for generators, solar and water tanks sized for storm loads.
British Virgin Islands
What we do not claim
We do not publish wind ratings or certify buildings in the British Virgin Islands for a hurricane category. The design is checked by your engineer of record for the loads set for your site in the British Virgin Islands.
Products and solutions
The World Steel pages behind this guide
Island by island
How this applies in your island
The British Virgin Islands have 5 islands. Open Jost Van Dyke, Beef Island, Peter Island and more or Tortola to see the local wind, ground and coast, the road from Road Town and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your BVI project is cut, welded, inspected and packed.
Q&A
What Virgin Islander buyers ask
What did Irma teach builders in the BVI?
That roofs, openings and connections fail first, and that hills make wind much stronger. Rebuilding focuses on a continuous load path from roof to foundation, which is how we design steel frames.
Are hillside sites designed for more wind?
Usually. Topographic speed-up over crests and steep slopes can raise the design wind a lot; your engineer sets the factor and we design to it.
Do you supply the roof and wall cladding too?
Yes. Roof and wall panels, purlins, girts and fixings can ship with the frame, designed for the same wind at your site in the British Virgin Islands.
British Virgin Islands solutions
Every British Virgin Islands guide
Related pages
Code facts on this page summarize practice in the British Virgin Islands and the standards it references. They are not legal or engineering advice; your engineer of record and the planning and building authorities confirm the code and edition in force for your project.
Contact World Steel · British Virgin Islands
Talk to us about steel for the British Virgin Islands
WhatsApp, email or a video call with our engineers, booked at an hour that suits Road Town. Our contact page for the British Virgin Islands has the ports, the local time and the form.