Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Plant visit & factory audit

Walk the plant that will build your steel

2,500 metric tons of structural steel a month, made in World Steel’s own plant in Vietnam: the first and only fabricator in Vietnam accredited under IAS AC472, since 2019. Fly in, meet the engineers and audit every step your steel takes before it ships to the US.

From the USA Your route
HO CHI MINH CITY TAY NINH PROVINCE SGN AIRPORT WORLD STEEL HQ WORLD STEEL PLANT 20 MIN 60 MIN
SGN Airport → Head office20 min
Head office → Plant60 min
Runway to shop floor≈ 80 min

Typical drive times by car. City traffic can change them.

  • 2,500 t

    structural steel fabricated a month (about 2,750 short tons)

  • Since 2019

    IAS AC472 accredited, the first and only fabricator in Vietnam

  • Twice a year

    plant and design office audited under the IAS program

  • 300+

    people in engineering, production and quality control

Getting here

From the runway to the shop floor in about 80 minutes

Three stops, two short drives. You meet the people who design your steel, then the people who build it, on the same day.

  1. SGN Ho Chi Minh City

    Tan Son Nhat International Airport (SGN)

    Ho Chi Minh City’s international airport. Land, clear immigration and meet our team.

  2. 20 min
  3. Reception and lobby of the World Steel head office in Ho Chi Minh City, with the World Steel sign and framed certificates Photo

    World Steel head office

    55 Le Thuc Hoach Street, Ho Chi Minh City. The engineers who design your steel work here: design review, Tekla model, PEB Studio.

  4. 60 min
  5. Drone view across the World Steel plant: office block in front, fabrication halls behind Photo

    World Steel plant, Hai Son Industrial Park

    Duc Hoa, Tay Ninh Province. 20,000 m² (215,000 sq ft) of fabrication halls where your steel is cut, welded, coated, inspected and packed.

Your visit day

One day, office to shop floor

  • Morning at the head office

    Meet the engineers and project managers. Walk through the design basis, the Tekla model and how your project would run in PEB Studio.

  • Drive to the plant

    About an hour west of the city by car to Hai Son Industrial Park. A good time to go over the audit plan.

  • Walk the shop floor

    Material intake, CNC cutting, beam lines, fit-up and welding, blasting, the paint hall, QC release and packing, in the order steel moves.

  • Audit the records

    Sit down with QC: mill certificates, welding procedures and welder qualifications, inspection reports and the IAS AC472 program.

  • Close-out

    Questions answered on the spot, open items written down, and the follow-up sent by email after your visit.

Long shop floor of built-up members, overhead cranes and a center walkway Photo
One of the World Steel fabrication halls in Vietnam where US orders are built.
Welder beside a deep built-up girder running through the automatic line Photo
Coated members drying in rows on stands in the paint hall Photo

Factory audit

Build your audit checklist

Tap what your team wants to audit. Your picks go straight into the booking form, and we prepare those records and stations for the day.

0 of 8 on your list

You will not be the first auditor

Audited twice a year since 2019

Under IAS AC472 the plant and the design office are audited twice a year, with IAS experts and Smith-Emery, the inspection agency named on our certificate. The records your auditors ask for are the ones those audits check.

Auditors walking the shop floor during a periodic IAS AC472 audit.
Records reviewed with the QC team at the plant.
Production welding witnessed on a built-up member.
Finished, primed members checked with their identification marks.

Who visits

Teams that qualify their fabricator in person

  • General contractors

    Project and preconstruction managers qualifying the fabricator for a large US job.

  • Owners and developers

    Owner’s representatives who want to see the plant behind the bid.

  • Engineers of Record

    Design teams checking how their drawings become fabricated steel.

  • Special inspectors and QA agencies

    Third-party agencies witnessing hold points or auditing the shop.

Plan your trip

Good to know before you fly

  • Pick two or three dates

    We check them against the production schedule, so you see the work you came for, and confirm one by email.

  • Visa for Vietnam

    US passport holders need a visa for Vietnam. Most visitors apply for the official e-visa before they fly. Check the current rules for your trip.

  • Where we meet

    At the head office in Ho Chi Minh City, about 20 minutes from Tan Son Nhat Airport, before the drive to the plant.

  • On the shop floor

    Closed-toe shoes please. We brief every visitor on the shop’s safety rules on arrival.

Book a visit

Your visitor pass

Suggest your dates and tell us who is coming. We confirm the day by email and send the agenda before you fly.

Book a plant visit or factory audit

Fields marked * are required. It takes a few minutes.

You and your company
The project
Who is coming
What you want to audit
Message and files

Products in your request

Questions

Plant visit questions

How far is the plant from the airport?

Tan Son Nhat International Airport (SGN) to the World Steel head office in Ho Chi Minh City takes about 20 minutes by car. From the head office to the plant at Hai Son Industrial Park, Tay Ninh Province, it is about 60 minutes. Traffic in the city can change both.

Can we audit the plant as part of supplier qualification?

Yes. Tell us which records and processes your checklist covers, and we prepare them for the day: mill certificates, welding procedures and welder qualifications, inspection and coating reports and the IAS AC472 quality program.

Can our special inspector come too?

Yes. Your special inspector or a third-party agency can witness hold points on your order at the plant. The plant is also inspected under IAS AC472 by Smith-Emery, the agency named on our certificate.

Is the visit tied to an order?

No. Many contractors visit before they bid or sign. If you have a job in mind, tell us its size and type so we can show similar work on the floor.

What if we cannot travel?

Book an online audit instead. We walk the shop floor on camera over Zoom or Microsoft Teams, share the records on screen and send the recording afterward.

Is any steel fabricated in the United States?

No. All structural steel for US orders is fabricated in this plant in Vietnam and shipped to a US port. The Westminster, California office handles quotes and coordination only.