Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Online factory audit

Audit our plant in Vietnam from your desk in the US

See the shop that fabricates 2,500 metric tons of structural steel a month, IAS AC472 accredited since 2019, live over Zoom or Microsoft Teams. We walk the floor on camera, share the records on screen and send you the recording.

World Steel · Online factory audit
REC Beam line Vietnam
  1. Joining
  2. Document review
  3. Shop floor live
  4. Witness point
  5. Wrap-up

You · USA

QC engineer

Project engineer

How a session runs

From the invitation to the recording

  1. Invitation and agenda

    We send the Zoom or Microsoft Teams link, or join yours, with the agenda and the records we will share.

  2. Records on screen

    Mill certificates, WPS and welder qualifications, inspection reports and the IAS AC472 program, shared screen by screen.

  3. Live walk of the shop

    A QC engineer carries the camera from material intake to packing. Ask to stop, zoom in or measure.

  4. Witness hold points

    For an order, hold points from the inspection plan are witnessed on camera, as they happen.

  5. Recording and minutes

    The recording and the minutes go to you afterward and stay on file with the project.

What we can show on camera

Pick your screens

Choose what your audit covers. Your picks are added to the booking form so the right people and records are ready on the call.

0 screens picked

Time planner

Find a time that works on both sides of the Pacific

Vietnam is 11 to 15 hours ahead of the US mainland. Pick your time zone to see when the plant’s working day falls in yours. Most sessions land at the end of the US workday.

Your time: workday and suggested window

Plant working hours, in your time

Suggested window

Your time 6:00 PM – 9:00 PM

Vietnam 7:00 AM – 10:00 AM, the next day

Both bars use your clock. Bars are for today’s date, so daylight saving time is included. We confirm the exact time by email.

After the call

What you keep

  • The full recording

    Every session is recorded and kept on file with the project for later review.

  • Minutes and open items

    What was checked, what was asked and what we follow up on, in writing.

  • The records you asked for

    Copies of the certificates and reports reviewed on screen, sent by email.

  • PEB Studio access

    On an order, the same members stay visible to your team in PEB Studio after the call.

Hold points witnessed on camera are recorded. Whether a remote witness meets your project’s inspection requirements is decided by your Engineer of Record and building official.

Book an online audit

Send us your meeting request

Suggest dates and your time zone. We reply by email with the invitation, or join the meeting you send us.

Book an online factory audit

Fields marked * are required. It takes a few minutes.

You and your company
The project
What you want to see
Message and files

Products in your request

Questions

Online audit questions

Zoom or Microsoft Teams?

Either. Tell us which one your company allows. We send the invitation, or join the meeting you send us.

When can we meet, given the time difference?

Vietnam is 11 to 15 hours ahead of the US mainland, depending on your time zone and daylight saving time. Early morning in Vietnam is late afternoon or evening of the day before in the US, so most sessions are booked at the end of the US workday. Use the time planner on this page to see the windows.

Can our special inspector witness hold points online?

Yes. Hold points from the inspection plan can be witnessed live on camera by you, your special inspector or a third-party agency, and the recording is archived. Whether a remote witness meets your project’s inspection requirements is for your Engineer of Record and building official to decide.

Can we ask to see something specific?

Yes. Name it in the form: a member, a weld, a coating reading or a record. The camera goes where you ask, inside the safety rules of the shop.

Do we need to install anything?

Only Zoom or Microsoft Teams. Records are shared on screen and sent by email afterward.

Is it a replacement for a plant visit?

It covers most of what a visit covers, from your desk. Many contractors start online and visit the plant later, before or during a large order.