How to specify a metal building so every bid prices the same thing

Metal building bids are only comparable when they answer the same specification. This is the checklist that makes them answer it.

· updated November 19, 2026 · 3 min read · World Steel USA engineering team

Metal building suppliers design their own system, so two bids for "a 60 by 120 meter warehouse" can describe very different buildings. The way to get comparable prices is a specification that fixes the inputs and leaves the suppliers to optimize the steel.

1. Code basis and loads

State the building code and edition, ASCE 7 edition and risk category, then the loads:

  • wind speed, exposure and enclosure classification;
  • ground snow load, drifts from adjacent roofs and parapets;
  • seismic site class and spectral values;
  • roof live load;
  • collateral load for sprinklers, lighting, ducts and ceilings;
  • equipment and hung loads with locations;
  • solar panel loads, if planned now or later.

Collateral load is the item most often under-specified, and the most expensive to fix later.

2. Geometry

  • Building width, length and eave height.
  • Roof slope and frame type: clear span, multi-span, mono-slope.
  • Bay spacing and any expansion end wall.
  • Interior column positions allowed or not allowed.
  • Mezzanines, canopies, lean-tos and their loads.

3. Deflection and serviceability

Set limits for frame drift, rafter and purlin deflection, and girt deflection behind brick or glazing. Tight limits add steel, so set them for real needs, not by habit.

4. Envelope

  • Roof system: standing seam or through-fastened, panel gauge, finish, warranty.
  • Wall panels: profile, gauge, finish, insulated panels where required.
  • Insulation type and thermal performance.
  • Gutters, downspouts, flashing and trim.

5. Openings and accessories

List doors, windows, louvers, skylights, ridge vents and framed openings with sizes and locations. Accessories are where bid scopes quietly diverge.

6. Coating

Primary and secondary framing coating, whether galvanized purlins are required, and the exposure. See our guide on ISO 12944 categories for coastal or humid sites.

7. Scope split

State who supplies anchor bolts, who designs foundations, and that erection is by the US contractor. List any items supplied by others.

8. Submittals

Require anchor bolt plans with reactions, erection drawings, calculations, a design certification letter and material certificates, with review periods stated.

Common gaps between bids

When metal building bids are compared line by line, the same differences appear again and again:

  • one bid includes gutters and downspouts, another does not;
  • one assumes 0.25 kPa (5 psf) collateral load, another 0.1 kPa (2 psf);
  • one includes base angle and closures, another lists them as by others;
  • one prices the frame for future expansion, another does not;
  • one includes insulation, another excludes it.

A specification that lists each of these items, and a bid form with one line per item, makes these differences visible before award.

Alternates and options

Ask for alternates as separate prices, for example:

  • standing seam roof instead of through-fastened;
  • insulated metal wall panels instead of single skin with batt insulation;
  • galvanized secondary framing;
  • crane-ready columns for a future crane.

This keeps the base bids comparable while letting the owner choose upgrades.

Review of the supplier's design

The supplier designs the building system, but the Engineer of Record still reviews it. Ask for calculations in a readable form, with loads, combinations and member checks listed, and anchor bolt reactions in a table the foundation engineer can use directly.

Future expansion

If the building may grow, say which walls are expandable. An expandable endwall is designed as a full frame so that a future extension can bolt on without new foundations at that line. It adds some steel now but saves a lot later.

Ask for a design summary

Ask each bidder for a one-page design summary listing the loads, deflection limits and code edition they used.

Make bids comparable

Put all of the above on a two-page criteria sheet and ask every supplier to price exactly that. Suppliers can still propose alternatives, but as clearly marked options. World Steel prices metal building systems this way, and our Package Builder helps set out the main inputs before you ask for a quote.

Quick answers

Which standard governs metal building design?

Metal buildings are designed to the adopted building code and ASCE 7, with AISC 360 and AISI S100 for hot-rolled and cold-formed members. The MBMA Metal Building Systems Manual is the common industry reference; World Steel designs to it.

Why do metal building bids differ so much?

Usually because of different assumptions on loads, deflection limits, accessories and envelope. A tight specification removes most of the spread.

What submittals should a metal building supplier provide?

Anchor bolt plans and reactions, erection drawings, design calculations, a letter of design certification and material certificates.