Pre-engineered metal buildings are built around a primary frame repeated along the building's length. Choosing the frame type is one of the first decisions, and it shapes the interior space, the roof and the steel tonnage.
Clear-span frames
A clear-span frame has no interior columns. Tapered columns and rafters form a rigid frame from one side wall to the other.
- Use for: hangars, sports halls, manufacturing floors, any space that must stay open.
- Trade-off: the wider the span, the deeper and heavier the frame.
Multi-span frames
Multi-span frames add one or more interior columns, often slender pipe or H columns, so each rafter spans a shorter distance.
- Use for: large warehouses and distribution centers where interior columns fit the racking grid.
- Trade-off: less steel per square meter, but columns in the floor plan.
Mono-slope frames
The roof slopes in one direction, with a tall wall on one side and a short wall on the other.
- Use for: buildings draining to one side, additions, roofs optimized for solar panels, retail fronts.
- Trade-off: taller high-side wall and unbalanced snow drift considerations.
Lean-to frames
A lean-to is a secondary frame that leans on the main building's columns.
- Use for: extra covered space for offices, storage or loading along a side wall.
- Trade-off: adds loads to the main frame, which must be designed for it.
Arched and curved frames
Curved rafters or arched trusses create a distinctive roof and can span long distances.
- Use for: architectural buildings, community centers, sports and leisure.
- Trade-off: more fabrication work and special cladding.
Comparison
| Frame type | Interior columns | Typical use | Steel efficiency |
|---|---|---|---|
| Clear span | None | Hangars, halls, plants | Lower for very wide spans |
| Multi-span | Yes | Warehouses, logistics | High |
| Mono-slope | Optional | Additions, retail, solar | Good |
| Lean-to | Uses main frame | Side extensions | Good |
| Arched | Usually none | Architectural, leisure | Depends on design |
Bay spacing matters too
Frame spacing along the building, typically 6 to 9 m (20 to 30 ft), affects purlin and girt sizes. Wider bays mean fewer frames but heavier secondary members. Designers often compare a couple of options before settling.
Endwall frames
Endwalls are designed differently from interior frames:
- Rigid endwalls use a full frame, which allows future expansion by removing the wall cladding and adding bays.
- Post-and-beam endwalls use lighter columns and a rafter supported by them, which saves steel but makes expansion harder.
If expansion is possible, specify a rigid endwall on that side.
Bracing systems
Frames resist loads across the building; bracing resists them along it. Options include rod or cable bracing, portal frames where openings prevent diagonal bracing, and wall diaphragms. Bracing location must suit doors and windows, so coordinate it with the architect.
Choosing the frame for the use
The frame type follows the use. Warehouses and distribution centres usually want the widest clear span the budget allows, so clear-span or multi-span frames dominate. Manufacturing buildings with cranes need frames sized for crane loads and runway brackets. Aircraft hangars and arenas may use clear-span frames of 60 m (200 ft) or more, or trusses. Small workshops and storage buildings often use simple mono-slope or gable frames with modest spans.
Ask the operator how the floor will be used now and in ten years. A multi-span frame with interior columns is usually lighter, but those columns cannot move later.
Frame depth and headroom
Tapered frames are deeper at the knee and ridge and shallower between. The deepest part of the rafter reduces headroom near the eave, which matters when racking or doors sit close to the sidewall. Give the designer the clear height you need at specific locations, not only at the eave, so the frame is shaped to suit.
Foundation reactions
Each frame type puts different loads on the foundations. Clear-span frames create large horizontal thrust at the base, which the foundation or a tie rod in the slab must resist. Multi-span frames spread the load over more columns. Ask the supplier for preliminary reactions early, so the foundation design can move ahead in parallel with the steel.
See them in 3D
World Steel's steel frame systems pages show each frame type with photos of real World Steel buildings. Choosing the frame early, with the fabricator's input, is the simplest way to keep a metal building economical.
Quick answers
How wide can a clear-span frame be?
Clear-span rigid frames commonly reach 30 to 60 m (100 to 200 ft) and more, depending on loads and economics.
Why choose a multi-span frame?
Interior columns shorten each span, which makes frames lighter. It suits buildings where columns do not block the use, such as many warehouses.
What is a mono-slope frame used for?
Buildings that drain to one side, additions against an existing building, and roofs set up for solar panels.
Keep building your steel plan
Go further on USPEB.com
On this topic
Across the US market
- Complete building solutionsFrame, cladding, doors and accessories
- Steel buildings by stateLoads and codes for every US state
- Products catalogFrames, purlins, panels and built-up members
- Large projects, 2,500 t a monthCapacity for large US general contractors
- Contractor partnershipLong-term supply for US contractors
- Solutions by stateState-by-state steel solutions