Our plant builds the steel. Your crew builds the job.
A clear line between World Steel and you, the US contractor and our customer, so your bid carries the right scope on each side.
World Steel, Vietnam
- Design calculations and drawings for your Engineer of Record
- Shop and erection drawings, included
- Fabrication, welding and coating in our plant
- Mill certificates, QC records and inspection access
- Packing by erection sequence, shipping to your US port
You, the US contractor
- Engineer of Record approval, PE seal and permit
- Foundations, anchor rods and site work
- Steel erection and the crew
- Local trades and building completion
Our engineers support your crew by phone and video while the frame goes up.
Contractor Partnership Program
Our production capacity is your capacity
Bid more steel without adding a shop. Contractors who build several jobs a year plan plant time around their pipeline with us, under one supply agreement across jobs and states.
Capacity for large jobs
The plant behind your quote has already built these
2,500 metric tons (about 2,750 short tons) of structural steel a month, from our own IAS AC472-accredited plant in Vietnam. Each job below was designed, detailed, fabricated and shipped by World Steel.
-
5,000 t about 5,500 short tons
Sunpro Steel Factory
Steel industryCan Tho City, Vietnam · 2024
-
2,500 t about 2,750 short tons
CPV Food Processing Factory
Food processingDong Nai Province, Vietnam · 2020
-
2,000 t about 2,200 short tons
Long Son petrochemical complex
Oil and gasBa Ria–Vung Tau, Vietnam · 2022
-
2,000 t about 2,200 short tons
M&D (MD Factory)
Warehouse and industrialThailand · 2024
-
1,500 t about 1,650 short tons
Tongwei Tien Giang feed factory, phase 1
Animal feedDong Thap Province, Vietnam · 2018
-
1,000 t about 1,100 short tons
New Era cold storage
Cold storage, phase 1 tonnageTay Ninh Province, Vietnam
Before you send
Questions contractors ask first
Something else? Write it in the message box and an engineer answers with your quote.
Do you work only with large contractors?
We are built for large jobs, at 2,500 metric tons a month, but we quote any US contractor with a real project. Many partnerships start with one building and grow.
Do you erect or install?
No. World Steel designs, fabricates and supplies the steel structure. You, the US contractor and our customer, erect it and handle the site, and our engineers support your crew by phone and video.
Can we visit or audit the plant before award?
Yes. Book a video walk-through from the US or visit the plant in Tay Ninh Province, Vietnam. Hold points on your job can be witnessed remotely.
What is the Contractor Partnership Program?
A long-term way of working for contractors who build several jobs a year: one supply agreement across jobs and states, and plant time planned around your pipeline. Tick "Partnership program" in the form to ask about it.
Not quite your project? Pick another route
- I have a bid package for a large jobYou are bidding a large job and have the bid documents.
- I have drawingsYou have a permit set, IFC model or sketches.
- I need a complete buildingYou know the use, the site and a rough size, but not the steel yet.
- I need Value EngineeringYou have a design and want steel or freight taken out of it.
- I need corrosion protectionYour site sees salt air, de-icing salt, fertilizer or fumes.
- I’m on the design teamYou are on the design team and need data, answers or delegated design.
- I need federal supply supportThe job is publicly funded or on a federal site.
- All quote routes