Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Coated members drying in rows on stands in the paint hall

Members drying in the World Steel paint hall in Vietnam after coating.

Insights · 4 articles

Shipping and import for US steel projects

Moving fabricated steel from an overseas shop to a US jobsite: packing, ocean freight, ports and customs.

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.