Your direct line at World Steel
VICTOR Dang
Global Sales Director, World Steel Group
View Victor’s profileHow we review a public job
Clauses first, proposal second
Public work has rules on where steel comes from. We read them with you before anyone spends time on a price.
-
We read the clauses
Steel-origin, domestic-content and trade clauses in the solicitation and the contract.
-
You confirm with the agency
The contracting officer or agency decides whether foreign steel is allowed and on what terms.
-
We quote only if it fits
If the rules allow steel made in Vietnam, we quote. If not, we tell you so before you spend time.
Where the steel comes fromWorld Steel’s steel is fabricated in Vietnam. We make no claim that it meets any domestic-content requirement. Whether it can be used on a public job is for the agency and your contract to decide.
Capacity for large jobs
The plant behind your quote has already built these
2,500 metric tons (about 2,750 short tons) of structural steel a month, from our own IAS AC472-accredited plant in Vietnam. Each job below was designed, detailed, fabricated and shipped by World Steel.
-
5,000 t about 5,500 short tons
Sunpro Steel Factory
Steel industryCan Tho City, Vietnam · 2024
-
2,500 t about 2,750 short tons
CPV Food Processing Factory
Food processingDong Nai Province, Vietnam · 2020
-
2,000 t about 2,200 short tons
Long Son petrochemical complex
Oil and gasBa Ria–Vung Tau, Vietnam · 2022
-
2,000 t about 2,200 short tons
M&D (MD Factory)
Warehouse and industrialThailand · 2024
-
1,500 t about 1,650 short tons
Tongwei Tien Giang feed factory, phase 1
Animal feedDong Thap Province, Vietnam · 2018
-
1,000 t about 1,100 short tons
New Era cold storage
Cold storage, phase 1 tonnageTay Ninh Province, Vietnam
Before you send
Questions contractors ask first
Something else? Write it in the message box and an engineer answers with your quote.
Can World Steel supply federally funded projects?
Only where the contract allows steel fabricated in Vietnam. Many federal and some state programs restrict foreign steel, so we review the clauses with you before any proposal.
Who decides if foreign steel is allowed?
The contracting officer or the agency, under the contract and the program’s rules. We do not decide eligibility and make no domestic-content claim.
What about private work on a federal site?
Private or non-appropriated funding can follow different rules. Choose that contract type in the form and share the clauses you have.
Not quite your project? Pick another route
- I have a bid package for a large jobYou are bidding a large job and have the bid documents.
- I am a contractorYou are a GC, design-builder, EPC or erector pricing steel or looking for a long-term fabricator.
- I have drawingsYou have a permit set, IFC model or sketches.
- I need a complete buildingYou know the use, the site and a rough size, but not the steel yet.
- I need Value EngineeringYou have a design and want steel or freight taken out of it.
- I need corrosion protectionYour site sees salt air, de-icing salt, fertilizer or fumes.
- I’m on the design teamYou are on the design team and need data, answers or delegated design.
- All quote routes