Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Inspector walking a line of painted built-up members on the shop floor

Final look at coated members before they are released to packing, World Steel plant in Vietnam.

Insights · 3 articles

Regional guides for US steel projects

State by state: the hazards, codes and ports that matter when steel for a US region is fabricated abroad.

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.